Browse
Search
2024-659-E-Solid Waste-Scope of work Garrett scale house-Proposal for basic services scalehouse building roof repair design services Orange County Solid Waste Management Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-659-E-Solid Waste-Scope of work Garrett scale house-Proposal for basic services scalehouse building roof repair design services Orange County Solid Waste Management Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:05:59 PM
Creation date
11/19/2024 3:05:58 PM
Metadata
Fields
Template:
Contract
Date
10/29/2024
Contract Starting Date
10/29/2024
Contract Ending Date
10/30/2024
Contract Document Type
Contract
Amount
$0.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 4 <br /> <br />ENGINEER, through is subconsultant, will provide construction quality assurance as follows: <br />1. Perform quality assurance to verify work follows the Contract Documents. Photographs <br />will be taken as deemed necessary for documentation. <br />2. Prepare and submit reports from each quality assurance site visit relaying information <br />pertaining to weather, area worked, application methods, material types installed during <br />the site visit and listing of non-conforming items requiring Contractor's correction. <br />3. ENGINEER has assumed 40 hours for a senior engineering technician to provide quality <br />assurance observations. <br />2. The responsibilities of OWNER are as follows: <br />1. Review all project deliverables in a timely manner and forward submittals to ENGINEER <br />as appropriate. <br />3. The time period for the performance of ENGINEER’s services are as follows: <br />• Tasks 1, 2, and 3 will be completed within 60 days following authorization. <br />• Task 4 will be completed based on the bidding and award schedule set forth in the <br />Contract Documents. <br />• Task 5 and 6 will be completed based on the Contractor’s schedule. <br />4. The method of payment for services rendered by ENGINEER shall be set forth as <br />follows: <br />Task and Description Fee <br />Task 1 – Engineering Design $ 1,400 <br />Task 2 – Technical Drawings and Specifications $ 5,400 <br />Task 3 – Project Manual $ 3,600 <br />Task 4 – Bidding Services $ 3,600 <br />Task 5 – Construction Administration $ 6,675 <br />Task 6 – Construction Quality Assurance $ 5,600 <br />TOTAL FEE $26,275 <br />ENGINEER will invoice OWNER monthly on a task-by-task basis based on percent <br />complete for each task. <br />5. OWNER has established the following special provision and/or other consideration or <br />requirements in respect to the Assignment. <br />None. <br /> <br />AUTHORIZATION TO PROCEED SIGNATURE PAGE FOLLOWS <br />Docusign Envelope ID: 7D5599C2-324B-4935-846D-ABC72AC2C8C6
The URL can be used to link to this page
Your browser does not support the video tag.