Browse
Search
2024-659-E-Solid Waste-Scope of work Garrett scale house-Proposal for basic services scalehouse building roof repair design services Orange County Solid Waste Management Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-659-E-Solid Waste-Scope of work Garrett scale house-Proposal for basic services scalehouse building roof repair design services Orange County Solid Waste Management Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:05:59 PM
Creation date
11/19/2024 3:05:58 PM
Metadata
Fields
Template:
Contract
Date
10/29/2024
Contract Starting Date
10/29/2024
Contract Ending Date
10/30/2024
Contract Document Type
Contract
Amount
$0.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 4 <br /> <br />PROPOSAL FOR BASIC SERVICES <br />SCALEHOUSE BUILDING ROOF REPAIR DESIGN SERVICES <br />ORANGE COUNTY SOLID WASTE MANAGEMENT FACILITY <br /> <br />1. The Basic Services of ENGINEER are as follows: <br />Task 1- Engineering Design <br />ENGINEER will perform, through its subconsultant REI Engineers (REI), the following <br />engineering design calculations: <br />1. Determine design wind loads in accordance with ASCE 7 as required by the current <br />edition of the State Building Code. <br />2. Primary and secondary (overflow) drainage for compliance with the current edition of the <br />State Plumbing Code. <br />3. Existing and proposed roof system R-Value for compliance with the current edition of the <br />State Energy Conservation Code. <br />Task 2 - Technical Drawings and Specifications <br />ENGINEER will prepare, through its subconsultant REI, comprehensive scaled drawings and <br />technical specifications for the project. <br />Task 3 – Project Manual <br />Owner will provide bidding and contract documents, including the invitation to bid, instructions to <br />bidders, agreement, general conditions, etc. to the ENGINEER. ENGINEER will incorporate <br />Owner’s bidding and contract documents and ENGINEER’s technical specifications into a Project <br />Manual for bidding and construction purposes. ENGINEER will submit a draft Project Manual for <br />review by the Owner and incorporate review comments as necessary. ENGINEER will provide <br />the Contract Documents, including complete Project Manual and construction drawings, to the <br />OWNER for bidding and construction phases of the project. <br />Task 4 – Bidding Services <br />During the Bid Phase of the project, ENGINEER will: <br />1. Conduct the pre-bid conference. <br />2. Address contractor questions/comments. <br />3. Prepare addenda, as necessary, to address changes to the Contract Documents and <br />responses to questions. Addenda or addenda items requested by or necessitated by <br />changes made by the OWNER may require additional fees. <br />Docusign Envelope ID: 7D5599C2-324B-4935-846D-ABC72AC2C8C6
The URL can be used to link to this page
Your browser does not support the video tag.