Browse
Search
2024-656-E-AMS-National Power Corporation-PNW Emergency Services Replace UPS
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-656-E-AMS-National Power Corporation-PNW Emergency Services Replace UPS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:00:38 PM
Creation date
11/19/2024 3:00:32 PM
Metadata
Fields
Template:
Contract
Date
10/28/2024
Contract Starting Date
10/28/2024
Contract Ending Date
10/30/2024
Contract Document Type
Contract
Amount
$147,732.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> <br /> <br /> <br />Date: October 17, 2024 <br />To: Orange County <br />Attn: Angel Barnes <br />Reference: Orange County 80kW UPS Installation <br />Quote Number: JC10172024-01 <br /> <br />We are pleased to provide you with our proposal for the above referenced project. Please review the enclosed Bill <br />of Materials and terms and conditions. <br /> <br />To proceed, please sign the acceptance form at the end of this quote and send the entire form back to me. <br />Quantity 1 – Eaton 93PM 80kW UPS <br />• 93PM 208V or 220V 4 wire in, 208 or 220V 3 or 4 wire out <br />• 80kW Rated, 120kW Frame Capacity <br />• Standard 95% Efficiency <br />• Includes Power Xpert Gateway Card <br />• 11 minutes minutes of internal runtime at 80 kW <br />• Includes 7x24 Startup, and 1 year on-site parts and labor coverage <br />• 93PM Remote Monitoring- <br />• PredictPulse Opt Out, No Remote Monitoring included <br />• Standard Ground Shipping to NC PUBLISHED LEAD TIME CURRENTLY 9-10 WEEKS <br />Quantity 1 – Installation <br />• Remove and retire existing 80KW UPS system. <br />• Supply and install a new Eaton 93PM 80KW UPS system <br />• Lifting and Handling Equipment. <br />• Permitting <br />Total price for the above equipment (Not including any applicable tax): $147,732.00 <br />Notes <br />Price is firm for orders released to production Thirty (30) Days from the date of the quote. <br />Delivery: Lead times are subject to market demand fluctuations and frequently change between time of proposal and time of <br />order. If delivery is critical, please verify current times at time of order. <br /> <br />Basis of Quotation: No Specifications or drawings provided quoted per customer request only. <br />Unless expressly listed in BOM above this proposal specifically excludes: Sales Tax, Utility Fees, Low Voltage Wiring, <br />Concrete Pad, Off-Loading, Any exhaust, cooling ducting or piping, NETA, NRTL Testing, Load bank testing, Coordination <br />studies, Infrared scanning or Engineered Drawings. <br />Terms and Conditions <br />Quoted Price is based upon acceptance of National Power Terms and Conditions of Sale available for review at: <br />https://www.natpow.com/_files/ugd/eeb4dd_8ff50e84962d4e82a09131fb580a698e.pdf <br />Alterations or modifications to these terms or payment schedules may impact price. <br />Docusign Envelope ID: CCC32566-D1D2-42CF-A1B0-14FD8836F509
The URL can be used to link to this page
Your browser does not support the video tag.