Orange County NC Website
Exclusions <br />1.Offsite system monitoring fees <br />2.Cost associated with multiple trips to the job site due to incompletion by others <br />3.Working in areas containing hazardous materials or confined space <br />4.Cost associated with schedule acceleration or multiple unplanned phases <br />5.Telephone line for DACT and/or IP Network Connection <br />6.Costs associated with bypassing the system during construction <br />7.Building and construction permit fees <br />8.Creating base building auto cad drawings for the project <br />9.Ceiling and/or wall removal, replacement, patching, and painting <br />10.Per project aggregate general liability insurance <br />11.Overtime (except as specifically noted) <br />12.After hours work (except as specifically noted) <br />13.Additional testing due to others <br />14.Dedicated phone lines <br />15.Dedicated IP Network Drop <br />16.120 VAC power <br />17.Conduit raceway, Electrical boxes and supports <br />18.Performance or payment bonds <br />19.Bonding or special insurance <br />20.Fire caulking <br />21.Scaffolding and lifts (except as specifically noted) <br />22.Knox box <br />23.Shunt trip breakers <br />24.Security system interface or door lock release <br />25.Back boxes for devices are not included unless listed in this proposal's provided equipment list <br />Page 6 of 11 <br />Docusign Envelope ID: 5F68D13E-7D54-4A62-A443-4829C4B9AEF0