Browse
Search
2024-646-E-AMS-Siemens Industry-Performing Circuit testing afterhours
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-646-E-AMS-Siemens Industry-Performing Circuit testing afterhours
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 2:54:57 PM
Creation date
11/19/2024 2:54:48 PM
Metadata
Fields
Template:
Contract
Date
10/22/2024
Contract Starting Date
10/22/2024
Contract Ending Date
10/24/2024
Contract Document Type
Contract
Amount
$4,880.78
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exclusions <br />1.Offsite system monitoring fees <br />2.Cost associated with multiple trips to the job site due to incompletion by others <br />3.Working in areas containing hazardous materials or confined space <br />4.Cost associated with schedule acceleration or multiple unplanned phases <br />5.Telephone line for DACT and/or IP Network Connection <br />6.Costs associated with bypassing the system during construction <br />7.Building and construction permit fees <br />8.Creating base building auto cad drawings for the project <br />9.Ceiling and/or wall removal, replacement, patching, and painting <br />10.Per project aggregate general liability insurance <br />11.Overtime (except as specifically noted) <br />12.After hours work (except as specifically noted) <br />13.Additional testing due to others <br />14.Dedicated phone lines <br />15.Dedicated IP Network Drop <br />16.120 VAC power <br />17.Conduit raceway, Electrical boxes and supports <br />18.Performance or payment bonds <br />19.Bonding or special insurance <br />20.Fire caulking <br />21.Scaffolding and lifts (except as specifically noted) <br />22.Knox box <br />23.Shunt trip breakers <br />24.Security system interface or door lock release <br />25.Back boxes for devices are not included unless listed in this proposal's provided equipment list <br />Page 6 of 11 <br />Docusign Envelope ID: 5F68D13E-7D54-4A62-A443-4829C4B9AEF0
The URL can be used to link to this page
Your browser does not support the video tag.