Orange County NC Website
Scope of Work <br />Holiday Labor Costs: 2.5x rate <br />Inclusions <br />1.Sales Tax (if tax exempt please provide tax exempt certification) <br />2.Freight <br />3.Engineering <br />4.Project Management for Siemens Scope of work <br />5.System Commissioning and Final Pretest <br />6.Final AHJ Testing and certification <br />7.Fire Alarm Submittal to customer <br />8.Fire Alarm Submittal to AHJ <br />9.Fire Alarm Permit or Electrical Permit or costs associated with this project <br />10.Professional Engineers stamp which may be required <br />11.Overtime (as specifically noted) <br />12.Supply or installation of any electrical conduits, cables, wiring or back boxes, and equipment <br />13.As interpreted in the specifications, as shown on drawings, and as defined in this proposal <br />14.Demolition of the existing fire alarm system <br />15.Price is based on Auto-CAD electronic drawings for the project being supplied to us by others <br />16.DACT <br />17.One (1) year warranty <br />18.Customer training <br />19.Final wiring terminations to the control panel <br />20.Three (3) submittals <br />21.Three (3) O&M manuals <br />22.Programming <br />Page 5 of 11 <br />Docusign Envelope ID: 5F68D13E-7D54-4A62-A443-4829C4B9AEF0