Docusign Envelope ID:A2263B78-7746-40A2-A238-D34F6FAD8083 <br /> responsibility for any delay occurring by reason of the Owner's being unable,through no fault of the Owner,to supply such item of information,approval <br /> or decision. <br /> 6.1.3 Should the Owner determine that the Designer is behind schedule,it may require the Designer to expedite and accelerate its efforts,including <br /> providing additional manpower or overtime,as necessary,to perform its services in accordance with the Key Milestone Listing at no additional cost to <br /> the Owner. <br /> 6.1.4 The commencement date for the Designer's Basic Services shall be the date of delivery to the Designer from the Owner of a fully executed <br /> original of this Agreement. <br /> 6.2 Adiustments to the Schedule <br /> 6.2.1 If the Designer's work on the Project is or will be delayed for more than sixty(60)days through no fault of the Designer,or if the Owner <br /> increases or decreases the scope or size of the Project by ten percent(10%)of currently estimated Total Project Cost,the Designer shall give prompt <br /> written notice to the Owner.Provided that such notice has been given,the Designer may request in writing an adjustment in the Key Milestone Listing <br /> dates,which shall be granted by the Owner to the extent reasonable. <br /> ARTICLE 7 <br /> DESIGNER'S COMPENSATION <br /> 7.1 Compensation for Basic Services <br /> 7.1.1 Compensation for Basic Services shall include all compensation due the Designer from the Owner for all services under this Agreement. <br /> 7.2 Breakdown of Compensation for Basic Services <br /> Not-to-exceed Compensation for Basic Services consists of the following compensation for the following separate categories of services: <br /> 7.2.1 Schematic Design Phase. As detailed in the CPL proposal dated Sept.4th,2024(Insert Lump Sum or Time and Materials as appropriate)fee of <br /> 7.2.2 Design Development Phase. As detailed in the CPL proposal dated Sept,4th,2024 fee of <br /> 7.2.3 Construction Document Phase. Lump sum fee of As detailed in the CPL proposal dated Sept.4th,2024. <br /> 7.2.4 Bidding and Contract Award. Lump sum fee of As detailed in the CPL proposal dated Sept.4th,2024. <br /> 7.2.5 Construction Phase. Lump sum fee of As detailed in the CPL proposal dated Sept.4th,2024. <br /> 7.2.6 Post Construction Phase. Lump sum fee of As detailed in the CPL proposal dated Sept.4th,2024. <br /> 7.2.7 Additional Basic Services(Select all that apply): <br /> fee of <br /> fee of <br /> fee of <br /> fee of <br /> 6 <br /> Revised 01/24 <br />