Browse
Search
OTHER-2024-072 Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility
OrangeCountyNC
>
Board of County Commissioners
>
Various Documents
>
2020 - 2029
>
2024
>
OTHER-2024-072 Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:05:14 PM
Creation date
11/19/2024 2:52:20 PM
Metadata
Fields
Template:
BOCC
Date
9/17/2024
Meeting Type
Business
Document Type
Contract
Agenda Item
6-a
Document Relationships
Agenda - 09-17-2024; 6-a - Approval of a Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 09-17-2024 Business Meeting
Agenda for September 17, 2024 BOCC Meeting
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 09-17-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID:A2263B78-7746-40A2-A238-D34F6FAD8083 <br /> Agreement,with supporting documents listing quantities,unit price,labor rates,man-hour estimates,overhead and profit. Total Project Cost shall be <br /> mutually agreed upon by Owner and Designer as noted in paragraph 4.2.4. The timing of this Total Project Cost agreement shall be identified as a <br /> milestone in Attachment D. If cost estimating is not part of the project scope,the Total Project Cost shall be specified here: [BLANK] <br /> 4.2.2 Project cost estimates shall be prepared by qualified staff members of the Designer or the authorized Project Consultants listed on Attachment <br /> E,or a qualified cost estimating Consultant to the Designer who are acceptable to the Owner. <br /> 4.2.3 Total Project Cost estimates shall be prepared at 3 points in the production of the Designer's work: <br /> A.At completion of 50%of schematic Design design;and <br /> B.At completion of 50%of design development;and <br /> C.At completion of 50%of construction ducments of the construction documents;and <br /> D.N/A <br /> 4.2.4 If applicable per section 4.2.3,when the first of these estimates of Total Project Cost has been approved in writing by the Owner,it shall be used <br /> by the Owner as a basis for appropriating funds specifically for the Project.Once this Total Project Cost has been so approved by the Owner and the <br /> conditions of the project(cost environment,time schedule,etc.)are reasonably similar,the Designer shall be obligated,without additional <br /> compensation,to adjust the design of the Project to assure that it remains within the approved Total Project Cost. <br /> 4.2.5 Should bidding or negotiation with contractors produce prices which,when added to the other elements of the approved Total Project Cost, <br /> produce a cost that is in excess of the approved Total Project Cost,the Designer shall participate with the Owner in negotiation and design adjustments <br /> to the extent such are necessary to obtain prices within the approved Total Project Cost. All activity of the Designer with respect to these matters shall <br /> constitute Basic Services and shall be performed by the Designer without additional compensation. If negotiation and design adjustments fail to bring <br /> costs within the Total Project Cost the Owner may reject all bids and Designer will redesign or reduce portions of the project in an effort to reduce the <br /> bid prices to within the Total Project Cost and rebid the project. All such redesign is included within Basic Services. If this second letting for bids does <br /> not produce bids that are within the approved Total Project Cost initially or after negotiations with the contractor,the Designer is not obligated to <br /> further redesign the Project. <br /> 4.3 Proiect Conferences <br /> 4.3.1 For the duration of the development of the Project,the Designer and its Consultants shall meet periodically with the Owner.The Designer shall <br /> meet with Owner as necessary to properly fulfill the requirements of this Agreement. The minimum regularly scheduled meetings which the Designer <br /> shall be required to attend are listed below: <br /> 4.4 Construction Administration <br /> 4.4.1 As part of Basic Services,the Designer shall provide all of the mutually agreed administrative services described in the Owner's contracts with <br /> the contractors for the Project. <br /> ARTICLE 5 <br /> ADDITIONAL SERVICES <br /> 4 <br /> Revised O1/24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.