Browse
Search
OTHER-2024-072 Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility
OrangeCountyNC
>
Board of County Commissioners
>
Various Documents
>
2020 - 2029
>
2024
>
OTHER-2024-072 Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:05:14 PM
Creation date
11/19/2024 2:52:20 PM
Metadata
Fields
Template:
BOCC
Date
9/17/2024
Meeting Type
Business
Document Type
Contract
Agenda Item
6-a
Document Relationships
Agenda - 09-17-2024; 6-a - Approval of a Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 09-17-2024 Business Meeting
Agenda for September 17, 2024 BOCC Meeting
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 09-17-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID:A2263B78-7746-40A2-A238-D34F6FAD8083 <br /> 3.2.5 The Designer and its Consultants shall perform all services in a reasonably timely manner in accordance with all mutually agreed schedules for <br /> the Project or required under this Agreement,and as provided in the construction agreement and any General Conditions of the Owner's construction <br /> agreements with the contractors for the Project. <br /> 3.2.6 At the mutual agreement of the Owner and Architect,or when the Architect has been found liable in a court of competent jurisdiction,the <br /> Architect shall reimburse the Owner for costs,damages,and expenses,including attorney's fees,incurred by the Owner when such costs,damages,and <br /> expenses result from negligent errors,omissions,or delays of the Designer or its Consultants.(Contract Specific Revision 9/6/24) <br /> 3.3 Designer's Consultants <br /> 3.3.1 The Designer's Consultants for the project,along with their key project personnel,are listed in Attachment E to this Agreement.No changes in <br /> the Consultants or key personnel indicated shall be permitted except with the prior written consent of the Owner. <br /> 3.3.2 All of the Designer's contracts with its Consultants shall be in writing and shall expressly provide that if this Agreement is terminated for any <br /> reason,the Owner may,at its sole option,take the assignment of the Consultants'contract with the Designer,that such assignment shall automatically <br /> take place upon notification in writing by the Owner to the Consultants and the Consultants shall continue to be bound by the contract after such <br /> assignment.A copy of each contract between the Designer and a Consultant shall be furnished to the Owner within seven(7)days of its execution. <br /> ARTICLE 4 <br /> BASIC SERVICES <br /> 4.1 Basic Services <br /> 4.1.1 The Designer shall perform as Basic Services the work and services described herein and in Attachment B to this Agreement. <br /> 4.1.2 The Basic Services will be performed by the Designer in the phases described in Attachment B. <br /> 4.1.3 The Owner shall have the right and option to require the Designer to prepare one separate bid packages with no additional compensation due <br /> the Designer.Such bid packages must be approved by Owner prior to submission and,at the Owner's option,may include but not be limited to: <br /> A.Demolition and preliminary site work; <br /> B.General work,plumbing,mechanical,electrical,fire protection; <br /> C.Landscaping and irrigation; <br /> D.Signage; <br /> E.Furniture. <br /> F.Water and sewer infrastructure <br /> G,Solar Sysem <br /> H.Storm Water Control Measures <br /> 4.2 Proiect Cost Estimates <br /> 4.2.1 At the times designated herein,the Designer shall develop an estimate of the total cost of the Project(the"Total Project Cost"),including <br /> Designer's fees,costs of the construction,costs of equipment,furnishings,furniture and signage,permit fees and appropriate contingencies,and <br /> exclusions,where applicable.These costs shall be prepared and submitted to the Owner substantially in the format shown in Attachment C to this <br /> 3 <br /> Revised O1/24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.