Browse
Search
2024-617-E-Soil & Water Dept-Wilkerson Grading-Stream debris removal for 2024 Streamflow Rehabilitation Assistance Program
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-617-E-Soil & Water Dept-Wilkerson Grading-Stream debris removal for 2024 Streamflow Rehabilitation Assistance Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 2:33:01 PM
Creation date
11/19/2024 2:31:51 PM
Metadata
Fields
Template:
Contract
Date
10/8/2024
Contract Starting Date
10/8/2024
Contract Ending Date
10/17/2024
Contract Document Type
Contract
Amount
$59,296.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 02/24 <br />3 <br />ii) Upon completion of the project, the Provider shall be responsible for restoring the <br />project sites to a condition equal to or better than their pre-existing conditions. This <br />obligation includes, but is not limited to, the restoration, repair, or replacement of any <br />physical features disturbed or damaged during the construction process to any area of <br />the property impacted by the project including the egress, ingress, equipment staging <br />areas, access routes for equipment, and roads through the properties. <br /> <br /> <br />4. Duration of Services <br /> <br />a. Term. The term of this Agreement shall be from October 1, 2024 to November 30, <br />2025. <br /> <br />b. Scheduling of Services. <br />i) The Provider shall schedule and perform its activities in a timely manner. <br /> <br />ii) Should Orange SWCD determine that the Provider is behind schedule, it may require <br />the Provider to expedite and accelerate its efforts, including providing additional <br />resources and working overtime, as necessary, to perform its services in accordance <br />with the approved project schedule at no additional cost to Orange SWCD. <br /> <br />iii) The Commencement Date for the Provider's Basic Services shall be between October <br />1, 2024 and September 15, 2024, providing that dry weather conditions allow for <br />services to begin. <br /> <br />5. Compensation <br /> <br />a. Compensation for Basic Services. Compensation for Basic Services shall include all <br />compensation due the Provider from Orange SWCD for all services satisfactorily (as <br />determined by Orange SWCD) performed pursuant to this Agreement. The maximum <br />amount payable for Basic Services shall not exceed Fifty Nine Thousand Two Hundred <br />Ninety Six Dollars ($59,296). This includes a 10% contingency fee in addition to the <br />“Wilkerson Estimate” (Attachments E1-E4) for unforeseen or unexpected project <br />costs, in the event that circumstances require additional labor, additional equipment, or <br />other construction needs to complete the Work. Payment for satisfactorily performed <br />Basic Services shall become due and payable within thirty (30) days of Provider properly <br />invoicing Orange SWCD. Payment shall be subject to provisions of Section 5(b). <br /> <br />b. Disputes. In the event the amount stated on an invoice is disputed by Orange SWCD, then <br />Orange SWCD may withhold payment of all or a portion of the amount stated on an <br />invoice until the parties resolve the dispute. Should Provider fail to perform its duties <br />under the terms of this Agreement, Orange SWCD may, without fault or penalty, <br />withhold any payment associated with the work to be performed until such time as said <br />work is completed. <br /> <br />Docusign Envelope ID: 09E3DA75-EF11-41A2-AA45-CB9BEA757C8D
The URL can be used to link to this page
Your browser does not support the video tag.