Browse
Search
2024-611-E-AMS-CPL Architects Engineers-Design of a new Crisis Diversion Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-611-E-AMS-CPL Architects Engineers-Design of a new Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 2:28:24 PM
Creation date
11/19/2024 2:27:56 PM
Metadata
Fields
Template:
Contract
Date
10/3/2024
Contract Starting Date
10/3/2024
Contract Ending Date
10/15/2024
Contract Document Type
Contract
Amount
$1,719,650.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Palacio Collaborative <br />400 Galleria Pkwy SE, Suite 1500 Atlanta, GA 30339 <br />404.609.9006 • palaciocollaborative.com <br />08.15.2024 (Revised 08.16.2024) <br /> <br />Adam Chahulski, AIA, NCARB, LEEP AP <br />Sr. Vice President <br />CPL <br />6302 Fairview Rd, Suite 102 <br />Charlotte, NC 28210 <br />AChahulski@CPLteam.com <br /> <br />Re: Orange County Crisis Diversion Facility, Orange County, NC <br /> <br />Dear Adam, <br /> <br />Thank you for the opportunity to provide Cost Management Services for the Orange County Crisis <br />Diversion Facility project. We have provided a fee proposal below based on the project being a +/- <br />27,000sf upgraded new-build facility and associated sitework with an anticipated construction budget <br />of +/-$16,000,000 using the CM-at-Risk delivery method. <br /> <br />50% SCHEMATIC DESIGN ESTIMATE $19,750 <br />Includes production of two (2) separate estimates (two building/site options), pre/post review, estimate <br />revisions, modest allowance for alternates pricing, budget/scope alignment, and CM estimate review & <br />reconciliation <br />50% DESIGN DEVELOPMENT ESTIMATE $29,500 <br />Includes estimate production, pre/post review, estimate revisions, modest allowance for alternates pricing, <br />budget/scope alignment, and CM estimate review & reconciliation <br />50% CONSTRUCTION DOCUMENTS ESTIMATE $ 8,500 <br />Same scope of work as design development <br />TOTAL COST MANAGEMENT FEE $57,750 <br /> <br />Notes <br />• We have included cost in the Schematic Design stage estimate for up to two different pricing <br />exercises. <br />• Estimate delivery timeline will be negotiated prior to start of work. Please anticipate at least a <br />two (2) week turnaround and up to five (5) weeks to deliver a draft estimate for client’s review <br />• The estimate production schedule will not start until all necessary documents are received. <br />Receiving updated documents during estimate production may result in at least a three (3) day <br />addition to the delivery schedule <br />• Skipping a proposed design phase will result in a fee adjustment that equates to the higher <br />figure between: <br />o Fee of estimated phase + 50% of skipped phase <br />o Fee of skipped phase + 50% of estimated phase <br />• Providing an update of the completed design phase estimate to accommodate a +75% <br />submittal will result in a 25% surcharge <br /> <br /> <br /> <br />Docusign Envelope ID: A2263B78-7746-40A2-A238-D34F6FAD8083
The URL can be used to link to this page
Your browser does not support the video tag.