Browse
Search
2024-611-E-AMS-CPL Architects Engineers-Design of a new Crisis Diversion Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-611-E-AMS-CPL Architects Engineers-Design of a new Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 2:28:24 PM
Creation date
11/19/2024 2:27:56 PM
Metadata
Fields
Template:
Contract
Date
10/3/2024
Contract Starting Date
10/3/2024
Contract Ending Date
10/15/2024
Contract Document Type
Contract
Amount
$1,719,650.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />EXHIBIT A <br />SCOPE OF SERVICE <br /> <br />CIVIL ENGINEERING | ENVIRONMENTAL | SURVEYING | GIS | LANDSCAPE ARCHITECTURE | CONSTRUCTION SERVICES <br />19 of 22 <br />5410 Trinity Road <br />Suite 102 <br />Raleigh, NC 27607 <br /> <br /> <br />P 919.866.4951 <br />F 919.859.5663 <br />www.timmons.com <br /> <br />Proposed Fee Summary <br />Survey Services <br />Task S01 – Control and Boundary Survey $ 7,000 Fixed Fee <br />Task S02 – Topographic Survey $ 12,000 Fixed Fee <br />Task S03 – Underground Utility Location $ 2,500 Fixed Fee <br />Task S04 – Recombination Plat $ 4,500 Fixed Fee <br />Task S05 – Annexation Plat & Description $ 2,500 Fixed Fee <br />Geotechnical Services <br />Task G01 – Geotechnical Services (Not to Exceed) $ 27,500 T&M <br />Task G02 – Clearing Fee (Not to Exceed) $ 7,500 T&M <br />Water/Wastewater Services <br />Task U01 – Hydrant Flow Testing $ 2,000 Fixed Fee <br />Task U02 – Water System Hydraulic Analysis $ 5,000 Fixed Fee <br />Environmental Services <br />Task W01 – Wetland/Stream Delineation $ 4,600 T&M <br />Task W02 – Wetland/Stream Confirmation & Buffer Determination $ 4,600 T&M <br />Task W03 – Phase 1 ESA $ 4,200 T&M <br />Task W04 – Protected Species Review & Consultation $ 2,000 T&M <br />Task W05 – Tree Inventory $ 26,000 T&M <br />Task W06 – PCN for Nationwide Permit, Water Quality Certificate $ 5,800 T&M <br /> & Buffer Authorization <br />Task W07 – 401/404 & Riparian Buffer Permit Processing $6,000 T&M <br />Engineer Services <br />Task E01 – Schematic Design $ 11,500 Fixed Fee <br />Task E02 – Design Development $ 23,000 Fixed Fee <br />Task E03 – Construction Documents $ 46,000 Fixed Fee <br />Task E04 – Bidding $ 2,875 Fixed Fee <br />Task E05 – Construction Administration $ 28,750 Fixed Fee <br />Task E06 – Project Closeout $ 2,875 Fixed Fee <br />Task E07 – Permitting $ 15,000 Fixed Fee <br />Task E08 – Special Use Permit Assistance (if required) $ 12,500 Fixed Fee <br />Task E09 – Rezoning Assistance (if required) $ 15,000 Fixed Fee <br />Landscape Architecture Services <br />Task L01 – Code Compliant Planting Plan $ 10,000 Fixed Fee <br />Task L02 – Enhanced Planting Plan & Amenity Space/Hardscape/ $ 12,500 Fixed Fee <br /> Streetscape Design <br />Task L03 – Construction Administration $ 5,800 Fixed Fee <br />Task L04 – Closeout $ 1,800 Fixed Fee <br />TOTAL PROPOSED FEE $311,300.00 <br />Docusign Envelope ID: A2263B78-7746-40A2-A238-D34F6FAD8083
The URL can be used to link to this page
Your browser does not support the video tag.