Orange County NC Website
<br /> <br /> <br /> <br /> <br />EXHIBIT A <br />SCOPE OF SERVICE <br /> <br />CIVIL ENGINEERING | ENVIRONMENTAL | SURVEYING | GIS | LANDSCAPE ARCHITECTURE | CONSTRUCTION SERVICES <br />17 of 22 <br />5410 Trinity Road <br />Suite 102 <br />Raleigh, NC 27607 <br /> <br /> <br />P 919.866.4951 <br />F 919.859.5663 <br />www.timmons.com <br /> <br />Coordination with plan review staff, design team, etc. for construction plan submittals and review sets is <br />included. One, in-person meeting with the client and/or design team for coordination purposes and up to three <br />conference calls are included. <br /> <br />Task L02 - Enhanced Planting Plan and Amenity Space/Hardscape/Streetscape Design <br /> <br />Utilizing the Code Compliant Planting Plan, Timmons Group will prepare an enhanced planting plan, <br />supporting notes, and details. This plan will address planting beyond what is required to meet streetscape, <br />buffer yards, foundation plantings, and tree canopy minimums providing a more wholistic approach to the <br />landscape of the development. <br /> <br />We will work closely with the architect to understand the additional reflective spaces in their design program. <br />From this understanding, we will develop schematic design level amenity/hardscape plans. Upon approval <br />from the owner and Architect, we will prepare the Construction Documents of the amenity/hardscape areas <br />that will be suitable for owner review, pricing, and competitive bidding purposes. <br /> <br />Anticipated documents and coordination items are as follows: <br />• Enhanced Planting Plan <br />• Enhanced Planting Notes and Details <br />• Amenity/Hardscape Schematic Layout Plan <br />• Amenity/Hardscape Plans depicting specialty hardscape location, size, and materials for site <br />amenity features <br />• Amenity/Hardscape Details depicting specialty hardscape size and materials for site amenity <br />features <br />• Hardscape Specifications (to be issued with construction documents) <br />• Coordination with the civil engineer for grading and drainage plan adjustments and spot <br />elevations for site amenity spaces <br />• Three (3) meetings/conference calls with the owner, architect, and design team for project <br />coordination are included. <br /> <br /> <br />Task L03 - Construction Administration <br /> <br />We will assist OA in conducting a Pre-Demolition Meeting on site. When required, we will participate in up to <br />six (6) weekly progress site visits combined with OAC meetings. We will review RFI’s and issue addenda as <br />necessary and review sitework submittals by the contractor. <br /> <br />Anticipated deliverables, travel, and/or meetings are as follows: <br />• On-Site OAC meetings and site visits as needed <br />• Response to RFI’s <br />• Sitework submittal reviews <br /> <br /> <br />Docusign Envelope ID: A2263B78-7746-40A2-A238-D34F6FAD8083