Browse
Search
2024-611-E-AMS-CPL Architects Engineers-Design of a new Crisis Diversion Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-611-E-AMS-CPL Architects Engineers-Design of a new Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 2:28:24 PM
Creation date
11/19/2024 2:27:56 PM
Metadata
Fields
Template:
Contract
Date
10/3/2024
Contract Starting Date
10/3/2024
Contract Ending Date
10/15/2024
Contract Document Type
Contract
Amount
$1,719,650.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />EXHIBIT A <br />SCOPE OF SERVICE <br /> <br />CIVIL ENGINEERING | ENVIRONMENTAL | SURVEYING | GIS | LANDSCAPE ARCHITECTURE | CONSTRUCTION SERVICES <br />14 of 22 <br />5410 Trinity Road <br />Suite 102 <br />Raleigh, NC 27607 <br /> <br /> <br />P 919.866.4951 <br />F 919.859.5663 <br />www.timmons.com <br /> <br />• Refine Site Layout Plan <br />• Develop Utility Plan <br />• Develop Stormwater Management Plan <br />• Review Geotechnical Report <br />• Develop Grading Plan <br />• Develop Erosion Control Concept Plan <br />• Team Coordination & Meetings <br />• Project Management & QA/QC <br />• Outline Specifications (Division 2) <br />Task E03 - Construction Documents <br />The design team will prepare Final Design construction drawings based on the approved design development <br />drawings. <br />• Notes & Details <br />• Site Layout & Landscape Plan <br />• Utility Plan, Details, Profiles and Calculations <br />• Detailed Grading Plan <br />• Detailed Drainage Plan and Calculations <br />• SWM Plan and Calculations <br />• Storm Drainage calculations (gravity pipes, culverts, inlet spread, inlet throats, hydraulics) <br />• Design and calculations for up to one (1) SCM <br />• Erosion Control Plan and Details <br />• Team Coordination & Meetings <br />• Phase I Erosion Control Plan – preliminary disturbance limits <br />• Phase II Erosion Control Plan – ultimate disturbance limits <br />• Erosion control sequence narrative <br />• Erosion Control Details, Calculations, and Quantities in conformance with structural practices and <br />specifications in conformance with Orange County and NC Erosion and Sediment Control Handbook <br />• Miscellaneous details and calculations <br />• QA/QC <br />• Technical Specifications (Division 2) <br />• Bid Form Coordination with Architect <br />Task E04 - Bidding <br />Timmons will assist CPL with bidding services. Timmons will prepare a bid set of construction site plans and <br />specifications, attend a pre-bid meeting, respond to questions from bidders and contribute to any required <br />addenda. <br />• Attend Pre-Bid Conference <br />• Respond to Bid Inquiries <br />• Prepare Addenda <br />Docusign Envelope ID: A2263B78-7746-40A2-A238-D34F6FAD8083
The URL can be used to link to this page
Your browser does not support the video tag.