Browse
Search
2024-611-E-AMS-CPL Architects Engineers-Design of a new Crisis Diversion Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-611-E-AMS-CPL Architects Engineers-Design of a new Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 2:28:24 PM
Creation date
11/19/2024 2:27:56 PM
Metadata
Fields
Template:
Contract
Date
10/3/2024
Contract Starting Date
10/3/2024
Contract Ending Date
10/15/2024
Contract Document Type
Contract
Amount
$1,719,650.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />EXHIBIT A <br />SCOPE OF SERVICE <br /> <br />CIVIL ENGINEERING | ENVIRONMENTAL | SURVEYING | GIS | LANDSCAPE ARCHITECTURE | CONSTRUCTION SERVICES <br />13 of 22 <br />5410 Trinity Road <br />Suite 102 <br />Raleigh, NC 27607 <br /> <br /> <br />P 919.866.4951 <br />F 919.859.5663 <br />www.timmons.com <br /> <br />not include mitigation fee payment, or payment of NCDEQ DWR’s review fee. This task also includes <br />additional time spent for site plan revisions and additional RAIs. <br /> <br />Items NOT included in the Scope of Services of this Agreement: <br />Timmons Group will only perform services authorized per this agreement. Anything not expclitly listed will not <br />be completed, this includes but is not limited to the below which can be added for an additional fee. <br />• Traditional survey of wetland flags <br />• Phase II or III Environmental Site Assessments <br />• Protected Species Surveys <br />• Historical Resource Coordination/Surveys <br />• Permitting Fees (application fees, cost of public notices, mitigation costs, etc.) <br />• Nutient Offet Mitigation Credit Coordination <br />• Mitigation Design <br />• Pre-Application Meetings <br />• Wetland Permit Compliance <br /> <br /> <br />ENGINEER SERVICES <br />Task E01 - Schematic Design <br />The team will prepare schematic design level construction drawings based on the final concept design. <br />Coordination of initial permitting requirements with the Town of Hillsborough <br />• Utility availability investigation <br />• Coordinate Layouts with Architect & Owner <br />• Revise Layouts Per Review Comments <br />• Utility System Concept Plan <br />• Stormwater Management Concept Plan <br />• Team Coordination & Meetings <br />• Coordination with NCDOT <br />• Project Management & QA/QC <br />Upon completion of schematic design, the team will contribute to the Design Narrative documenting the <br />schematic design phase. The team will document project requirements, design parameters and objectives and <br />the results of the schematic design meetings and will provide any necessary text or graphics to supplement the <br />narrative prepared by CPL. <br />Task E02 - Design Development <br />The design team will prepare Design Development construction drawings based on the approved schematic <br />design drawings. <br />Docusign Envelope ID: A2263B78-7746-40A2-A238-D34F6FAD8083
The URL can be used to link to this page
Your browser does not support the video tag.