Orange County NC Website
<br /> <br /> <br /> <br /> <br />EXHIBIT A <br />SCOPE OF SERVICE <br /> <br />CIVIL ENGINEERING | ENVIRONMENTAL | SURVEYING | GIS | LANDSCAPE ARCHITECTURE | CONSTRUCTION SERVICES <br />12 of 22 <br />5410 Trinity Road <br />Suite 102 <br />Raleigh, NC 27607 <br /> <br /> <br />P 919.866.4951 <br />F 919.859.5663 <br />www.timmons.com <br /> <br />requested no formal consultation be conducted if 404 permitting is anticipated unless there are expected <br />protected species surveys or impacts. This task does not include species surveys. <br /> <br />This task does not include species surveys. <br /> <br />This scope anticipates release with Task W01 Delineation for a joint site inspection. If released separately, <br />additional fee may be required. <br /> <br />Task W05 - Tree Inventory <br /> <br />Timmons Group will locate all deciduous trees 12” dbh or greater and non-deciduous trees 24” or greater dbh <br />on site as required by the Town of Hillsborough UDO Section 6.22.3.2. Trees will be located using handheld <br />GPS equipment and a point file in AutoCAD and/or GIS shapefile will be created. The proposed inventory area <br />will be provided to the Timmons Group Environmental Team before field work is conducted. If the project size <br />exceeds 20-acres, Timmons will perform 100’ x 100’ sample survey areas for each separate undisturbed <br />portion of the site containing an acre or more per the UDO. <br />A CAD file including all collected points with the tree genus and species, DBH, and latitude/longitude <br />information and a map depicting all inventoried trees and their calculated critical root zones will be provided. <br /> <br />*This fee does not include a tree protection plan. <br /> <br /> <br />Task W06 - PCN for Nationwide Permit, Water Quality Certification, & Buffer Authorization <br /> <br />A Pre-Construction Notification (PCN) for a 404 Nationwide Permit (NWP), corresponding 401 Water Quality <br />Certification (WQC), and Riparian Buffer Authorization will be prepared and submitted to the USACE and <br />DWR for the proposed development. The PCN submittal will contain a narrative describing in detail the <br />purpose of the project and the necessity of the proposed disturbance to demonstrate that this disturbance is <br />warranted. This task includes wetland and stream mitigation coordination but does not include mitigation fee <br />payment or payment of NCDEQ DWR’s review fee. <br /> <br />This scope is for one Pre-Construction Notification which meets the requirements for an NWP. If proposed <br />impacts do not meet the requirements for a Nationwide Permit and/or if multiple permitting phases are <br />proposed, a revised scope will be required. Requests for Additional Information, if required by the agencies, <br />will be handled under Time and Material Task W06. <br /> <br /> <br />Task W07- 401/404 & Riparian Buffer Permit Processing <br />Responses to requests for additional Information (RAIs) will be prepared to answer any questions posed by <br />the USACE and DWR as a result of the PCN application, as needed. Negotiation of NWP and WQC will be <br />undertaken to facilitate regulatory approval of the project. This task includes mitigation coordination, but does <br />Docusign Envelope ID: A2263B78-7746-40A2-A238-D34F6FAD8083