Browse
Search
2024-611-E-AMS-CPL Architects Engineers-Design of a new Crisis Diversion Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-611-E-AMS-CPL Architects Engineers-Design of a new Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 2:28:24 PM
Creation date
11/19/2024 2:27:56 PM
Metadata
Fields
Template:
Contract
Date
10/3/2024
Contract Starting Date
10/3/2024
Contract Ending Date
10/15/2024
Contract Document Type
Contract
Amount
$1,719,650.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />EXHIBIT A <br />SCOPE OF SERVICE <br /> <br />CIVIL ENGINEERING | ENVIRONMENTAL | SURVEYING | GIS | LANDSCAPE ARCHITECTURE | CONSTRUCTION SERVICES <br />11 of 22 <br />5410 Trinity Road <br />Suite 102 <br />Raleigh, NC 27607 <br /> <br /> <br />P 919.866.4951 <br />F 919.859.5663 <br />www.timmons.com <br /> <br />the Client while Timmons Group will also complete a search through a Freedom of <br />Information Act (FOIA) request. <br />• In order to qualify for one of the Landowner Liability Protections (LLPs) offered by the <br />Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), the “User” <br />or party for whom the Phase I ESA is prepared must complete the ASTM Standard E 1527-21 <br />User Questionnaire provided by Timmons Group. Failure to provide this information could result <br />in a determination that “all appropriate inquiry” is not complete and forfeiture of CERCLA <br />protection. In addition to the User, interviews will be conducted with the present owner and one <br />(1) or more state and/or local agency officials (as applicable and accessible) with the objective to <br />obtain information identifying RECs in connection with the Subject Property. <br />• Upon completion of the site reconnaissance, file reviews, and interviews, a report on the findings <br />of the Phase I ESA will be prepared in accordance with ASTM Standard E 1527-21. Included <br />within the Phase I ESA report will be recommendations for additional investigations as warranted. <br />• The performance of this Phase I ESA specifically excludes any subsurface investigations, <br />structural integrity assessments, radon investigations, chain-of-title reports/investigations, cultural <br />resources investigations, wetland/stream delineation, or any sample collection and analysis <br />(including asbestos containing materials and lead based paint). <br />• Per ASTM standards, the Phase I ESA will be valid for 180 days or 6 months. <br /> <br />This scope covers one fee for an ERIS report. If more than one ERIS report is needed, a revised scope with <br />additional fee may be required. <br /> <br />This scope anticipates release with Task W01 Delineation for a joint site inspection. If released separately, <br />additional fee may be required. <br /> <br /> <br />Task W04 - Protected Species Review & Consultation <br /> <br />Timmons Group will conduct a Threatened and Endangered Species Review for the project area. Prior to the <br />site inspection, Timmons will conduct a NC Natural Heritage Program (NCNHP) and US Fish and Wildlife <br />Service (USFWS) IPAC database search for the project area. During the site inspection, Timmons will review <br />existing habitat conditions on-site as they relate to protected species with the potential to occur in the area. If <br />provided, conceptual layouts for the site will be reviewed and utilized in coordination. No additional site <br />planning, conceptual modeling, or site visits will be conducted as part of this effort. Information obtained from <br />database results, any previously conducted site visits, and any previously produced conceptual layouts will be <br />used to make a preliminary determination of potential impact to federally listed species. <br /> <br />Following the site inspection, if no other federal review is anticipated and/or protected species surveys or <br />impacts are anticipated, Timmons Group will initiate consultation with the USFWS to verify potential impacts <br />to protected species. Recommendations for mitigating any potential species that may affect the project will be <br />provided following consultation. Any additional Habitat Assessments or Species Surveys and/or additional <br />investigations/coordination required by USFWS (including Requests for Additional Information) is not included <br />in this scope but can be provided under a separate Statement of Work. Please note, the USFWS has <br />Docusign Envelope ID: A2263B78-7746-40A2-A238-D34F6FAD8083
The URL can be used to link to this page
Your browser does not support the video tag.