Browse
Search
2024-611-E-AMS-CPL Architects Engineers-Design of a new Crisis Diversion Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-611-E-AMS-CPL Architects Engineers-Design of a new Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 2:28:24 PM
Creation date
11/19/2024 2:27:56 PM
Metadata
Fields
Template:
Contract
Date
10/3/2024
Contract Starting Date
10/3/2024
Contract Ending Date
10/15/2024
Contract Document Type
Contract
Amount
$1,719,650.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />EXHIBIT A <br />SCOPE OF SERVICE <br /> <br />CIVIL ENGINEERING | ENVIRONMENTAL | SURVEYING | GIS | LANDSCAPE ARCHITECTURE | CONSTRUCTION SERVICES <br />10 of 22 <br />5410 Trinity Road <br />Suite 102 <br />Raleigh, NC 27607 <br /> <br /> <br />P 919.866.4951 <br />F 919.859.5663 <br />www.timmons.com <br /> <br />means). A preliminary wetland delineation map showing the approximate size, shape and location of wetlands <br />and/or waters of the U.S. present on the subject property will then be prepared. <br /> <br /> <br />Task W02 - Wetland/Stream Confirmation & Buffer Determination <br /> <br />Timmons Group will facilitate the confirmation of wetland and stream locations through feature flagging and <br />submittal of a Jurisdictional Determination (JD) package to the USACE and a Buffer Determination Request <br />to NCDEQ Division of Water Resources (DWR) (or appropriate local government agency). This package will <br />consist of a narrative, delineation map, wetland delineation field data sheets, and stream data forms. The <br />buffer determination package will include similar maps of the streams and stream data forms. Timmons Group <br />will conduct a joint site visit** with the USACE and NCDEQ DWR (or appropriate local government agency) to <br />review the site conditions, flagged wetland limits and confirm findings. A Preliminary Jurisdictional <br />Determination (PJD) concurrence letter or an informal concurrence for the wetland delineation will be <br />requested from the USACE and a Buffer Determination Letter will be obtained from DWR (or appropriate local <br />government agency). <br /> <br />Should the agencies not be able to meet jointly, the additional site visit will be billed Time & Materials with <br />prior approval from the Client. This scope does not include any local government buffer confirmation fees <br />which may apply. <br /> <br /> <br />Task W03 - Phase I ESA <br /> <br />Timmons Group will complete a Phase I Environmental Site Assessment in full compliance with the scope and <br />limitations of the American Society of Testing and Materials (ASTM) Standard E 1527-21 (Standard Practice <br />for Environmental Site Assessments: Phase I Environmental Site Assessment Process). <br />• In accordance with ASTM Standards as prescribed by the United States Environmental Protection <br />Agency All Appropriate Inquiry (EPA AAI) process, reasonably available environmental regulatory <br />database listings and historical information will be accessed and reviewed prior to evaluating the <br />presence and/or locations of recognized environmental conditions (RECs) as defined by ASTM <br />Standards. Utilized historic resource data will include, but not be limited to, aerial photographs, <br />city directories, topographic maps, and fire insurance maps. Any identified RECs and/or areas of <br />potential environmental concern will be a focal point of site inspection. <br />• Timmons Group will complete a site inspection of the Subject Property which will include a visual <br />reconnaissance of the immediately adjoining properties. RECs and/or areas of potential <br />environmental concern will be documented photographically. <br />• Records on file with the North Carolina Department of Environmental Quality (DEQ), and/or <br />Orange County, as available, will be reviewed to identify active and/or historic facilities that may <br />represent a REC or an area of potential environmental concern. Any risk(s) associated with these <br />facilities will be assessed, as able. <br />• Per ASTM Standards, an environmental liens search must be completed. An environmental lien is <br />a charge, security, or encumbrance on title to a property to secure the payment of a cost, damage, <br />debt obligation, or duty arising out of response actions, cleanup, or other remediation of hazardous <br />substances or petroleum products. The search for environmental liens must be provided by <br />Docusign Envelope ID: A2263B78-7746-40A2-A238-D34F6FAD8083
The URL can be used to link to this page
Your browser does not support the video tag.