Browse
Search
2024-611-E-AMS-CPL Architects Engineers-Design of a new Crisis Diversion Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-611-E-AMS-CPL Architects Engineers-Design of a new Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 2:28:24 PM
Creation date
11/19/2024 2:27:56 PM
Metadata
Fields
Template:
Contract
Date
10/3/2024
Contract Starting Date
10/3/2024
Contract Ending Date
10/15/2024
Contract Document Type
Contract
Amount
$1,719,650.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />EXHIBIT A <br />SCOPE OF SERVICE <br /> <br />CIVIL ENGINEERING | ENVIRONMENTAL | SURVEYING | GIS | LANDSCAPE ARCHITECTURE | CONSTRUCTION SERVICES <br />8 of 22 <br />5410 Trinity Road <br />Suite 102 <br />Raleigh, NC 27607 <br /> <br /> <br />P 919.866.4951 <br />F 919.859.5663 <br />www.timmons.com <br /> <br />• Perform hydraulic calculations based on the available flow and pressure observed during testing <br />and the projected demands. <br />• Review and confirm sizing of the on-site water distribution piping to meet the flow and pressure <br />requirements. <br />• Provide a model results sheet showing a graphical system layout, design criteria summary and <br />residual pressure results for domestic scenarios as well as fire suppression. <br /> <br />Assumptions And Clarifications <br /> <br />• This proposal specifically excludes design, permitting, construction administration, and other <br />construction phase services. <br />• This proposal does not include survey or SUE. <br />• Review/Submittal fees are the responsibility of the owner. <br />• Testing may not be performed per the requirements of NFPA 291 regarding the minimum <br />required reduction in residual pressure during the test. If testing is required to meet this portion <br />of NFPA 291, additional fee may be necessary. <br />• If the existing water system is not capable of supporting the proposed development, additional <br />system testing, modeling, and the design of remedial improvements may be required, and this <br />will require additional scope and fee to be negotiated. <br />• Minimum fire flow (sprinkler, hydrant flow, ISO or IFC) demands shall be determined and <br />provided by others. <br />• This scope includes one submission and one revision/resubmittal. Additional revisions and <br />submissions may require additional fees. <br />• Unless otherwise specified, hydraulic analyses are based on a single plan of development. If on- <br />site changes or phased development occurs, additional fee may be required. <br />Project Schedule <br /> <br />• Perform hydrant testing and provide flow test summary report within four weeks of receiving <br />written notice to proceed (dependent upon weather and coordination with water system owner). <br />• Perform hydraulic modeling and provide results sheet within three weeks after all necessary <br />information is obtained. <br /> <br />ENVIRONMENTAL SERVICES <br /> <br />Under this Agreement, Timmons Group will provide professional services relative to the approximately 7.8-acre <br />project located on parcels southwest of the intersection of Waterstone Drive and Highway 86 in <br />Hillsborough, NC (Orange County) outlined below. <br /> <br />Docusign Envelope ID: A2263B78-7746-40A2-A238-D34F6FAD8083
The URL can be used to link to this page
Your browser does not support the video tag.