Browse
Search
2024-611-E-AMS-CPL Architects Engineers-Design of a new Crisis Diversion Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-611-E-AMS-CPL Architects Engineers-Design of a new Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 2:28:24 PM
Creation date
11/19/2024 2:27:56 PM
Metadata
Fields
Template:
Contract
Date
10/3/2024
Contract Starting Date
10/3/2024
Contract Ending Date
10/15/2024
Contract Document Type
Contract
Amount
$1,719,650.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LETTER OF AGREEMENT Crisis Diversion Center Orange County September 5, 2024 Page 3 of 4 10. MEP infrastructure will be based on the SD narratives previously submitted, which includes the design of geothermal wells. 11. Commissioning shall be provided by the Client. 12. Refer to Timmons Group and Palacio’s fee proposals for additional exclusions and clarifications. 13. Any items not contained in our Scope of Services or contrary to the assumptions listed above will be deemed additional services. If requested by the Client, additional services will be provided on an hourly basis at our Standard Hourly Billing rates, or as a fixed fee mutually agreed to in advance by both parties. CLIENT RESPONSIBILITIES The Client shall appoint an “Owner’s Representative” to act as the point of contact for CPL. It shall be the responsibility of the client to provide the following: • Unrestricted access to the project site. • Reasonable advance notice of scheduled meetings. • Decisions on critical issues in a timely manner. • Payment of all invoices in accordance with this agreement. COMPENSATION CPL agrees to provide the professional design services listed in the Scope of Services. Our fee proposal is based upon work-effort projections and applicable billing rates for the scope of work anticipated for this project. We propose a fixed fee of $1,719,650.00 for Construction Documents through Construction Administration and Closeout services. This fee includes reimbursable expenses and is summarized in the following table. Description Fee Task I – Schematic Design $143,890.00 Task II thru V – Construction Documents thru Construction Phase Services CPL – Architectural & Interior Design $623,960.00 CPL – Furniture Design & Procurement $32,000.00 CPL – MEP Engineering $474,500.00 CPL – Structural Engineering $120,000.00 Timmons – Site, Civil, and Landscape Design $176,100.00 Timmons – Environmental (T&M) $53,200.00 Timmons - Wastewater $7,000.00 RHA Health – Clinical Operations $51,000.00 Palacio – Cost Estimating $38,000.00 Total Fee $1,719,650.00 We will bill monthly for the progress of the work. Normal and customary reimbursable expenses are included in our fee. ADDITIONAL SERVICES • Items not specifically defined in the Scope of Services. Docusign Envelope ID: A2263B78-7746-40A2-A238-D34F6FAD8083
The URL can be used to link to this page
Your browser does not support the video tag.