Orange County NC Website
z <br />All firms are generally capable of completing the stated scope of work, After each firm was <br />considered based on the above-mentioned criteria, Summit Consulting Engineers of <br />Hillsborough, North Carolina is the firm that is recommended for award, <br />FINANCIAL IMPACT: Annual cost of this contract is estimated to be less than $10,000 per <br />year. These funds are appropriated in the Solid Waste Management Department's 2005-2006 <br />operating budget, <br />RECOMMENDATION(S): The Manager recommends that the Board award the Request for <br />Proposal for miscellaneous surveying work associated with Landfill operations to Summit <br />Consulting Engineers of Hillsborough, North Catalina, consistent with its proposal dated <br />September 15, 2005; and authorize the Manager to sign an agreement reflecting the terms of <br />the proposah <br />