Orange County NC Website
7 <br />Revised 01/24 <br />2.2 The Contract Documents are complementary; what is called for by one is as binding as if <br />called for by all. If the Contractor finds a conflict, error or discrepancy in the Contract <br />Documents, the Contractor shall notify the Designer in writing before proceeding with the Work <br />affected thereby. In resolving such conflicts, errors and discrepancies, the Contract Documents <br />shall be given preference in the following order: Construction Contract, Modifications, Addenda, <br />General Conditions, Specifications, and Drawings. Figure dimensions on Drawings shall govern <br />over scale dimensions, and detailed Drawings shall govern over general Drawings. Any Work <br />that may reasonably be inferred from the Contract Documents as being required to produce the <br />intended result shall be supplied whether or not it is specifically called for. Work, materials or <br />equipment described in words which, so applied, have a well-known technical trade meaning <br />shall be deemed to refer to such meaning and to incorporate any recognized standards which <br />are a part of such meaning if not otherwise defined within the Contract Documents. <br /> <br />2.3 Miscellaneous items, accessories and work which are not specifically mentioned, but which <br />are essential to produce a complete and properly operating installation, or useable structure or <br />plant providing the indicated function shall be furnished and installed without change in the <br />Contract Price. Such miscellaneous items and accessories shall be of the same quality <br />standards, including material, style, finish, strength, class, weight and other applicable <br />characteristics, as specified for the major component of which the miscellaneous item or <br />accessory is an essential part, and shall be approved by the Designer before installation. This <br />requirement is not intended to include major components not covered by or inferable from the <br />Contract Documents. <br /> <br />2.4 The Work of all trades under the Contract Documents shall be coordinated by the Contractor <br />in such a manner as to obtain the best workmanship possible for the entire Project and all <br />components of the Work shall be installed or erected in accordance with the best practices of <br />the particular trade. <br /> <br />2.5 The Contractor shall fully complete the Work and shall be responsible for all of the Work <br />under the Contract Documents to which the Construction Contract applies. If the Contractor is <br />prevented from doing so by any limitation of the Contract Documents, the Contractor shall <br />immediately give notice thereof to the Designer and the Owner in writing. <br /> <br />2.6 Standard specifications or manufacturers' literature, when referenced, shall be of the latest <br />revision or printing unless otherwise stated and is intended to establish the minimum <br />requirements acceptable. <br /> <br />2.7 For those materials specified without the use of brand names, the Contractor shall submit <br />within thirty (30) days after his receiving the Construction Contract for signatures, any product <br />that meets the express requirements of the Specifications. Such Submittal shall include <br />manufacturer's data, test reports, performance data and certifications, samples, erection details, <br />and other applicable information as required to permit determination by the Designer whether <br />such proposed products are suitable. The Designer shall be the sole judge as to the suitability of <br />any proposed product. The burden of proof of quality rests with the Contractor. <br /> <br />2.8 The Contractor is required to examine and read the complete set of Contract Documents for <br />information concerning the Work, because some of the Work for which the Contractor will be <br />responsible may be indicated on or in documentation applying primarily to the Work of one or <br />more other separate prime contractors. No allowance will be made for the Contractor’s failure to <br />become familiar with the complete set of project documents. <br /> <br />Docusign Envelope ID: EF9C08D2-5B75-438B-8D6D-8473F81BD7C4