Browse
Search
2024-575-E-AMS-Hamlett Associates-RFP5417 -Motor Pool, Maintenance Shop, OPT ATS & Generator Work
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-575-E-AMS-Hamlett Associates-RFP5417 -Motor Pool, Maintenance Shop, OPT ATS & Generator Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 9:31:08 AM
Creation date
11/19/2024 9:28:16 AM
Metadata
Fields
Template:
Contract
Date
10/4/2024
Contract Starting Date
10/4/2024
Contract Ending Date
10/8/2024
Contract Document Type
Contract
Amount
$430,100.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />pdcengineers.com <br /> <br /> <br /> <br /> <br /> <br />ADDENDUM 02 – GENERAL <br /> <br /> <br />DATE: July 31, 2024 <br /> <br />PROJECT: Orange County, NC – Motor Pool and Maintenance Shop <br /> PDC Project No. 23017 <br /> <br /> <br /> <br /> <br />This Addendum, applicable to the work designed below, shall be understood to be and is a change to the bid <br />documents and shall be part of and included in the contract for the above referenced project. All General, <br />Supplementary and Special Conditions, etc., as originally specified or as modified below shall apply to these items. <br /> <br /> <br /> <br />Changes to General Specifications: <br />1. Specification 005200 Bid/Acceptance Form Clarification: <br />Base Bid (Motor Pool Scope) The contractor shall provide a price for all material and labor associated with <br />the Motor Pool Building Work. <br />Alternate #1 (Administration Building Scope) The contractor shall provide a price for all material and labor <br />associated with the Administration Building Work. <br />Alternate #2 (Maintenance Facility Scope) The contractor shall provide a price for all material and labor <br />associated with the Maintenance Facility Work. <br /> <br />2. Specification 012100 <br />a. Allowances Schedule 1.03.A – Revise Contingency Allowance to indicate $25,000. <br /> <br />3. Specification 012300 <br />a. Schedule of Alternates 1.03.A– Deleted Alternate No. 1 concerning controls. <br /> <br /> <br /> <br /> <br />END OF ADDENDUM 02 – GENERAL <br /> <br />Attachments: Specification sections 012100 and 012300 <br /> <br /> <br /> <br />7/31/24 <br />Docusign Envelope ID: EF9C08D2-5B75-438B-8D6D-8473F81BD7C4
The URL can be used to link to this page
Your browser does not support the video tag.