Browse
Search
2024-575-E-AMS-Hamlett Associates-RFP5417 -Motor Pool, Maintenance Shop, OPT ATS & Generator Work
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-575-E-AMS-Hamlett Associates-RFP5417 -Motor Pool, Maintenance Shop, OPT ATS & Generator Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 9:31:08 AM
Creation date
11/19/2024 9:28:16 AM
Metadata
Fields
Template:
Contract
Date
10/4/2024
Contract Starting Date
10/4/2024
Contract Ending Date
10/8/2024
Contract Document Type
Contract
Amount
$430,100.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OC Motor Pool and Maintenance Shop <br />PDC Project 23017 Transfer Switches 26 36 00 - 6 <br />B.Automatic Transfer Switches: <br />1.Inspect and test in accordance with NETA ATS,except Section 4. <br />2.Perform inspections and tests listed in NETA ATS,Section 7.22.3.The insulation-resistance <br />tests listed as optional are not required. <br />C.Provide additional inspection and testing as required for completion of associated engine <br />generator testing as specified in Section 26 32 13. <br />D.Correct defective work,adjust for proper operation,and retest until entire system complies with <br />Contract Documents. <br />E.Submit detailed reports indicating inspection and testing results and corrective actions taken. <br />3.04 CLEANING <br />A.Clean exposed surfaces to remove dirt,paint,or other foreign material and restore to match <br />original factory finish. <br />3.05 CLOSEOUT ACTIVITIES <br />A.Demonstration: Demonstrate proper operation of transfer switches to Owner,and correct <br />deficiencies or make adjustments as directed. <br />B.Training: Train Owner's personnel on operation,adjustment,and maintenance of transfer <br />switches. <br />1.Use operation and maintenance manual as training reference,supplemented with additional <br />training materials as required. <br />2.Provide minimum of four hours of training. <br />3.Instructor: Manufacturer's authorized representative. <br />4.Location: At project site. <br />C.Coordinate with related generator demonstration and training as specified in Section 26 32 13. <br />3.06 PROTECTION <br />A.Protect installed transfer switches from subsequent construction operations. <br />3.07 MAINTENANCE <br />A.See Section 01 70 00 -Execution and Closeout Requirements,for additional requirements relating <br />to maintenance service. <br />END OF SECTION 26 36 00 <br />Docusign Envelope ID: EF9C08D2-5B75-438B-8D6D-8473F81BD7C4
The URL can be used to link to this page
Your browser does not support the video tag.