Orange County NC Website
OC Motor Pool and Maintenance Shop <br />PDC Project 23017 Engine Generators 26 32 13 - 2 <br />C.Shop Drawings: Include dimensioned plan views and sections indicating locations of system <br />components,required clearances,and field connection locations.Include system interconnection <br />schematic diagrams showing all factory and field connections. <br />D.Manufacturer's equipment seismic qualification certification. <br />E.Derating Calculations: Indicate ratings adjusted for applicable service conditions. <br />F.Specimen Warranty: Submit sample of manufacturer's warranty. <br />G.Evidence of qualifications for installer. <br />H.Evidence of qualifications for maintenance contractor (if different entity from installer). <br />I.Manufacturer's Installation Instructions: Indicate application conditions and limitations of use <br />stipulated by product testing agency. Include instructions for storage,handling,protection, <br />examination,preparation,installation,and operation of product. <br />J.Manufacturer's factory emissions certification. <br />K.Manufacturer's certification that products meet or exceed specified requirements. <br />L.Source quality control test reports. <br />M.Provide NFPA 110 required documentation from manufacturer where requested by authorities <br />having jurisdiction,including but not limited to: <br />1.Certified prototype tests. <br />2.Torsional vibration compatibility certification. <br />3.NFPA 110 compliance certification. <br />4.Certified rated load test at rated power factor. <br />N.Manufacturer’s detailed field testing procedures. <br />O.Field quality control test reports. <br />P.Operation and Maintenance Data: Include detailed information on system operation,equipment <br />programming and setup,replacement parts,and recommended maintenance procedures and <br />intervals. <br />1.Include contact information for entity that will be providing contract maintenance and trouble <br />call-back service. <br />Q.Executed Warranty: Submit documentation of final executed warranty completed in Owner's name <br />and registered with manufacturer. <br />R.Maintenance contracts. <br />S.Project Record Documents: Record actual locations of system components,installed circuiting <br />arrangements and routing,and final equipment settings. <br />T.Maintenance Materials: Furnish the following for Owner's use in maintenance of project. <br />1.See Section 01 60 00 -Product Requirements,for additional provisions. <br />2.Extra Fuses: One of each type and size. <br />3.Extra Filter Elements: One of each type,including fuel,oil and air. <br />1.05 QUALITY ASSURANCE <br />A.Comply with the following: <br />1.NFPA 70 (National Electrical Code). <br />2.NFPA 37 (Standard for the Installation and Use of Stationary Combustion Engines and Gas <br />Turbines). <br />B.Installer Qualifications: Company specializing in performing the work of this section with minimum <br />three years documented experience with engine generator systems of similar size,type,and <br />complexity;manufacturer's authorized installer. <br />C.Maintenance Contractor Qualifications: Same entity as installer or different entity with specified <br />qualifications. <br />1.Contract maintenance office located within 200 miles of project site. <br />Docusign Envelope ID: EF9C08D2-5B75-438B-8D6D-8473F81BD7C4