Orange County NC Website
OC Motor Pool and Maintenance Shop <br />PDC Project 23017 Engine Generators 26 32 13 - 1 <br />SECTION 26 32 13 <br />ENGINE GENERATORS <br />PART 1 GENERAL <br />1.01 RELATED REQUIREMENTS <br />A.Section 03 30 00 -Cast-in-Place Concrete: Concrete equipment pads. <br />B.Section 23 11 23 -Facility Natural-Gas Piping. <br />C.Section 23 51 00 -Breechings,Chimneys,and Stacks: Engine exhaust piping. <br />D.Section 26 05 26 -Grounding and Bonding for Electrical Systems. <br />E.Section 26 05 29 -Hangers and Supports for Electrical Systems. <br />F.Section 26 05 48 -Vibration and Seismic Controls for Electrical Systems. <br />G.Section 26 05 53 -Identification for Electrical Systems: Identification products and requirements. <br />H.Section 26 36 00 -Transfer Switches. <br />1.02 REFERENCE STANDARDS <br />A.NECA 1 -Standard for Good Workmanship in Electrical Construction;2015. <br />B.NECA/EGSA 404 -Standard for Installing Generator Sets;2014. <br />C.NEMA MG 1 -Motors and Generators;2018. <br />D.NFPA 37 -Standard for the Installation and Use of Stationary Combustion Engines and Gas <br />Turbines;2021. <br />E.NFPA 70 -National Electrical Code;Most Recent Edition Adopted by Authority Having Jurisdiction, <br />Including All Applicable Amendments and Supplements. <br />F.NFPA 99 -Health Care Facilities Code;2021,with Amendment. <br />G.NFPA 110 -Standard for Emergency and Standby Power Systems;2022. <br />H.UL 1236 -Battery Chargers for Charging Engine-Starter Batteries;Current Edition,Including All <br />Revisions. <br />I.UL 2200 -Stationary Engine Generator Assemblies;Current Edition,Including All Revisions. <br />1.03 ADMINISTRATIVE REQUIREMENTS <br />A.Coordination: <br />1.Coordinate compatibility of generator sets to be installed with work provided under other <br />sections or by others. <br />a.Transfer Switches: See Section 26 36 00. <br />2.Coordinate the work with other trades to avoid placement of ductwork,piping,equipment or <br />other potential obstructions within the spaces dedicated for engine generator system. <br />3.Coordinate arrangement of equipment with the dimensions and clearance requirements of the <br />actual equipment to be installed. <br />4.Coordinate the work to provide electrical circuits suitable for the power requirements of the <br />actual auxiliary equipment and accessories to be installed. <br />5.Notify Architect of any conflicts with or deviations from Contract Documents.Obtain direction <br />before proceeding with work. <br />1.04 SUBMITTALS <br />A.See Section 01 30 00 -Administrative Requirements,for submittal procedures. <br />B.Product Data: Provide manufacturer's standard catalog pages and data sheets for each product, <br />including ratings,configurations,dimensions,finishes,weights,service condition requirements, <br />and installed features.Include alternator starting capabilities,engine fuel consumption rates,and <br />cooling,combustion air,and exhaust requirements. <br />1.Include generator set sound level test data. <br />2.Include characteristic trip curves for overcurrent protective devices upon request. <br />Docusign Envelope ID: EF9C08D2-5B75-438B-8D6D-8473F81BD7C4