Browse
Search
2024-575-E-AMS-Hamlett Associates-RFP5417 -Motor Pool, Maintenance Shop, OPT ATS & Generator Work
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-575-E-AMS-Hamlett Associates-RFP5417 -Motor Pool, Maintenance Shop, OPT ATS & Generator Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 9:31:08 AM
Creation date
11/19/2024 9:28:16 AM
Metadata
Fields
Template:
Contract
Date
10/4/2024
Contract Starting Date
10/4/2024
Contract Ending Date
10/8/2024
Contract Document Type
Contract
Amount
$430,100.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OC Motor Pool and Maintenance Shop <br />PDC Project 23017 Enclosed Switches and Circuit Breakers 26 28 16.16 - 5 <br />H.Provide fuses complying with Section 26 28 13 for fusible switches as indicated or as required by <br />equipment manufacturer's recommendations. <br />I.Set field-adjustable circuit breaker tripping function settings as directed. <br />J.Where accessories are not self-powered,provide control power source as indicated or as required <br />to complete installation. <br />K.Identify enclosed switches and breakers in accordance with Section 26 05 53. <br />3.03 FIELD QUALITY CONTROL <br />A.Perform inspections and tests listed in NETA ATS,Section 7.5.1.1 for breakers larger than 600A. <br />1.Verify equipment nameplate is in accorance with contract documents. <br />2.Inspect physical and mechanical condition. <br />3.Inspect anchorage and anlignment. <br />4.Verify unit is clean. <br />5.Operate breaker to enusre smooth operation. <br />6.Perform breaker adjustments in accorance with the power system study. <br />7.Perform resistance measurements through bolted connectionswith a low-resistance <br />ohmmeter. <br />8.Perform insulation-resistance test for one minute on each pole,phase-to-phase and phase- <br />to-ground with circuit breaker closed. <br />9.Perform contact/pole resistance test. <br />10.Determine long-time and short time pickup and delay settings by primary current injection. <br />11.Determine ground fault pickup and time delay by primary current injection. <br />B.Correct deficiencies and replace damaged or defective enclosed safety switches or associated <br />components. <br />3.04 ADJUSTING <br />A.Adjust tightness of mechanical and electrical connections to manufacturer's recommended torque <br />settings. <br />3.05 CLEANING <br />A.Clean dirt and debris from switch enclosures and components according to manufacturer's <br />instructions. <br />B.Repair scratched or marred exterior surfaces to match original factory finish. <br />END OF SECTION 26 28 16.16 <br />Docusign Envelope ID: EF9C08D2-5B75-438B-8D6D-8473F81BD7C4
The URL can be used to link to this page
Your browser does not support the video tag.