Orange County NC Website
OC Motor Pool and Maintenance Shop <br />PDC Project 23017 Electrical General Provisions 26 01 00 - 1 <br />SECTION 26 01 00 <br />ELECTRICAL GENERAL PROVISIONS <br />PART 1 GENERAL <br />1.01 SCOPE OF WORK <br />A.This Contractor shall provide all materials,equipment and labor necessary to install and set into <br />operation the electrical equipment as shown on the Engineering Drawings and as contained <br />herein. <br />1.02 QUALITY ASSURANCE <br />A.See the General and Supplementary General Conditions and Architectural Divisions. <br />B.All work shall be in accordance with the North Carolina State Building Code,which includes the <br />2020 edition of the National Electrical Code. <br />C.The Contractor shall be responsible for obtaining all permits and shall notify inspection <br />departments as work progresses. <br />D.Wherever the words "Approved","Approval",and "Approved Equal"appear,it is intended that <br />items other than the model numbers specified shall be subject to the approval of the Engineer. <br />E."Provide"as used herein shall mean that the Contractor responsible shall furnish and install said <br />item or equipment.“Furnish"as used herein shall mean that the Contractor responsible shall <br />acquire and make available said item or equipment and that installation shall be by others. "Install" <br />as used herein shall mean that the Contractor responsible shall make installation of items or <br />equipment furnished by others. <br />F.All personnel under this Contractor’s supervision shall be qualified to perform those portions of the <br />work assigned to them. Personnel (including project managers)deemed to be negative to the <br />overall success of the project shall be removed from the project and replaced with qualified <br />personnel who will be positive for the project. Upon written notification that particular personnel <br />have been deemed negative to the overall success of the project,this Contractor shall immediately <br />replace such particular personnel. The engineer shall be sole arbiter and any decision regarding <br />fitness of this Contractor’s personnel for this project shall not be subject to appeal. <br />1.03 SUBMITTALS <br />A.See General and Supplementary General Conditions and Division 1. <br />B.Within ten (10)days after notification of the award of the Contract and written notice to begin work, <br />the Contractor shall submit for approval to the Architect/Engineer a detailed list of equipment and <br />material which he proposes to use. <br />C.The Contractor shall provide an electronic pdf copy of the submittal data on the products,methods, <br />etc.proposed for use on the project. The submittal shall contain complete submittal data on all <br />products,methods,etc.proposed for use on the project. <br />D.Each submittal shall bear the approval of the Contractor indicating that he has reviewed the data <br />and found it to meet the requirements of the specifications as well as space limitations and other <br />project conditions. The submittals shall be clearly identified showing project name,manufacturer's <br />catalog number and all necessary performance and fabrication data. Detailed submittal data shall <br />be provided when items are to be considered as substitution for specified items. Acceptance for <br />approval shall be in writing from the Engineer. <br />E.The Contractor shall submit to the Engineer a set of accurately marked-up plans indicating all <br />changes encountered during the construction. Final payment will be contingent on receipt of these <br />as-built plans. <br />F.The Contractor shall furnish an electronic copy of maintenance and operating instructions. <br />G.The Contractor shall submit to the Engineer a duplicate set of final electrical inspection certificates <br />prior to final payment. <br />1.04 PRODUCT DELIVERY,STORAGE AND HANDLING <br />Docusign Envelope ID: EF9C08D2-5B75-438B-8D6D-8473F81BD7C4