Orange County NC Website
OC Motor Pool and Maintenance Shop <br />PDC Project 23017 Allowances 01 21 00 - 1 <br />SECTION 01 21 00 <br />ALLOWANCES <br />PART 1 GENERAL <br />1.01 SECTION INCLUDES <br />A.Contingency allowance. <br />1.02 CONTINGENCY ALLOWANCE <br />A.Contractor's costs for products,delivery,installation,labor,insurance,payroll,taxes,bonding, <br />equipment rental,overhead and profit will be included in Change Orders authorizing expenditure of <br />funds from this Contingency Allowance. <br />B.Funds will be drawn from the Contingency Allowance only by Change Order. <br />C.At closeout of Contract,funds remaining in Contingency Allowance will be credited to Owner by <br />Change Order. <br />1.03 ALLOWANCES SCHEDULE <br />A.Contingency Allowance: Include the stipulated sum/price of $​​​​50,000​​​​for use upon Owner's <br />instructions. <br />PART 2 PRODUCTS -NOT USED <br />PART 3 EXECUTION -NOT USED <br />END OF SECTION 01 21 00 <br />Docusign Envelope ID: EF9C08D2-5B75-438B-8D6D-8473F81BD7C4