Orange County NC Website
40 <br />Revised 01/24 <br />ARTICLE 23. ASSIGNMENTS AND SUBCONTRACTS <br /> <br />23.1 The Contractor shall not assign any portion of this Agreement nor subcontract the Work in <br />its entirety without the prior written consent of the Owner. Except as may be required under <br />terms of the bonds required by the Contract Documents, no funds or sums of money due or to <br />become due to the Contractor under the Contract Documents may be assigned. <br />ARTICLE 24. MEASUREMENTS <br /> <br />24.1 Before ordering material or doing Work which is dependent for proper size or installation <br />upon coordination with building conditions, the Contractor shall verify all dimensions and shall <br />be responsible for the correctness of same. No consideration will be given for any claim based <br />on differences between the actual dimensions and those indicated in the Contract Documents. <br />Any discrepancies between the Contract Documents and the existing conditions shall be <br />referred to the Designer for adjustment before any Work affected thereby is begun. <br />ARTICLE 25. CONTRACTOR AND SUBCONTRACTOR RELATIONSHIPS <br /> <br />25.1 Within thirty (30) days after initial receipt of the Construction Contract for signatures the <br />Contractor shall submit to the Designer and Owner for acceptance a current list of the names of <br />Subcontractors and such other persons and organizations (including those who are to furnish <br />materials or equipment fabricated to a special design) proposed for any and all portions of the <br />Work. The Contractor shall provide this list at this time even if the Contractor was required to <br />submit a list of proposed Subcontractors with the Contractor’s bid. The Designer shall promptly <br />reply to the Contractor in writing stating whether or not the Owner or the Designer, after due <br />investigation, has objection to any such proposed person or entity or if it needs additional <br />information to evaluate the persons on the list. Failure of the Designer to reply within ten (10) <br />days after the Contractor has furnished all required information shall constitute notice of no <br />objection. <br /> <br />The Contractor shall not contract with any such proposed person or entity to whom the Owner <br />or the Designer has made reasonable objection. If the Designer or Owner has reasonable <br />objection to any such proposed person or entity, the Contractor shall submit a substitute to <br />whom the Owner and the Designer have no reasonable objection. The Contractor shall make no <br />substitution for any Subcontractor, person, or entity previously allowed without first notifying the <br />Designer and Owner in writing and no substitution may be made if the Owner or Designer <br />makes a reasonable objection to such substitution. <br /> <br />25.2 The Contractor agrees that the terms of the Contract Documents, including all portions <br />thereof, shall apply to all Subcontractors of the Contractor as if they were the Contractor, and <br />that the Subcontractors of the Contractor shall, by means of their subcontracts, be bound by all <br />the terms of the Contract Documents including, but not limited to, Article 26 of these General <br />Conditions. <br /> <br />25.3 Payments to Subcontractors shall be made in accordance with the provisions of N.C. Gen. <br />Stat. §143-134.1. <br />ARTICLE 26. USE OF PREMISES <br />Docusign Envelope ID: EF9C08D2-5B75-438B-8D6D-8473F81BD7C4