Browse
Search
2024-575-E-AMS-Hamlett Associates-RFP5417 -Motor Pool, Maintenance Shop, OPT ATS & Generator Work
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-575-E-AMS-Hamlett Associates-RFP5417 -Motor Pool, Maintenance Shop, OPT ATS & Generator Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 9:31:08 AM
Creation date
11/19/2024 9:28:16 AM
Metadata
Fields
Template:
Contract
Date
10/4/2024
Contract Starting Date
10/4/2024
Contract Ending Date
10/8/2024
Contract Document Type
Contract
Amount
$430,100.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
36 <br />Revised 01/24 <br />action by the Owner under this paragraph, all warranties and bonds given or to be given by the <br />Contractor shall remain in effect or shall be given by the Contractor. <br />19.2 Should the cost of such action by the Owner exceed the amount due or to become due the <br />Contractor, the Contractor and his sureties shall be liable for and shall pay to the Owner the <br />amount of such excess. <br />ARTICLE 20. PARTIAL PAYMENTS <br /> <br />20.1 Within thirty (30) days after his initial receipt of the Construction Contract for signatures, <br />the Contractor shall submit to the Designer a Schedule of Values. The Schedule of Values shall <br />indicate the value of the Work, including applicable overhead and profit, for each Division and <br />section of the Project Specifications. The Designer and Owner shall be provided with the <br />Contractor's estimate papers, Subcontractor agreements, supplier quotes, or other documents <br />substantiating these values if so requested in writing by the Designer. The Contractor shall <br />provide the requested documentation within seven (7) days after receipt of the Designer's <br />written request. The Schedule of Values shall be subject to approval by the Owner, and if the <br />Owner and the Contractor cannot agree upon the Schedule of Values, the Designer shall <br />prepare it, and the Schedule of Values as prepared by the Designer shall be binding on the <br />Owner and the Contractor. No Request for Payment shall be certified by the Designer until the <br />Designer has issued approval of said Schedule of Values. <br /> <br />20.2 Not later than the fifth (5th) day of each calendar month the Contractor shall submit to the <br />Designer a Request for Payment for Work done during the previous calendar month. The <br />Request for Payment shall be in form of AIA Document G702 (latest edition) and shall show <br />substantially the value of Work done (including the value of material delivered to the Project or <br />stored by the Contractor at another site, subject to the conditions hereinafter set forth) during <br />the previous calendar month, and shall sum up the financial status of the Work with the <br />following information: <br /> <br />a) Total Contract Price, including any adjustment thereto made pursuant to the Contract <br />Documents. <br /> <br />b) Value of Work completed and materials properly stored to date. <br /> <br />c) Less amount retained. <br /> <br />d) Less previous payments. <br /> e) Current amount due. <br /> <br />f) Balance remaining. <br /> <br />The Contractor, upon request of the Designer, shall substantiate the request with invoices, <br />vouchers, payrolls, or other evidence. <br /> <br />20.3 When payment is requested or made on an account of stored materials, such materials <br />must be stored on the Owner's property at such places and in such a manner as may be <br />designated by the Designer. However, in the sole discretion of the Owner, with permission <br />in writing from the Designer and Owner and under such circumstances as may be determined <br />by the Owner, such materials may be stored in a bonded warehouse. The location and <br />Docusign Envelope ID: EF9C08D2-5B75-438B-8D6D-8473F81BD7C4
The URL can be used to link to this page
Your browser does not support the video tag.