Browse
Search
2024-575-E-AMS-Hamlett Associates-RFP5417 -Motor Pool, Maintenance Shop, OPT ATS & Generator Work
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-575-E-AMS-Hamlett Associates-RFP5417 -Motor Pool, Maintenance Shop, OPT ATS & Generator Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 9:31:08 AM
Creation date
11/19/2024 9:28:16 AM
Metadata
Fields
Template:
Contract
Date
10/4/2024
Contract Starting Date
10/4/2024
Contract Ending Date
10/8/2024
Contract Document Type
Contract
Amount
$430,100.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br />Revised 01/24 <br />Contract Documents. The Contractor will at all times maintain good discipline and order at the <br />site, and will comply with all applicable OSHA standards. <br /> <br />Any person employed by the Contractor, any Subcontractor, or any sub-subcontractor who, in <br />the opinion of the Designer or the Owner, does not perform his Work in a proper and skillful <br />manner or is intemperate or disorderly shall, at the written request of the Owner or Designer, be <br />removed forthwith by the Contractor, Subcontractor, or sub-subcontractor employing such <br />person without cost to the Owner, and shall not be employed again in any portion of the Work <br />without the written approval of the Owner or Designer. <br /> <br />Should the Contractor fail to remove such person or persons or fail to furnish suitable and <br />sufficient personnel for the proper prosecution of the Work within three (3) days after written <br />order, the Owner may withhold further payment by written notice until compliance with such <br />order. <br /> <br />7.4 If, in the opinion of the Designer or the Owner, any Subcontractor on the Project is <br />incompetent or otherwise unsatisfactory, he shall be replaced by the Contractor with no <br />increase in the Contract Price if and when directed by the Designer or the Owner in writing. <br /> <br />7.5 The Contractor shall furnish all materials, equipment, labor, transportation, construction <br />equipment and machinery, tools appliances, fuel, light, heat, and all other facilities and <br />incidentals necessary for the execution, maintenance, initial operation, and completion of the <br />Work, other than those specifically excluded by the Contract Documents and to be furnished by <br />the Owner or others. When use or storage of hazardous materials or equipment or methods of <br />more than ordinary risk are necessary in accomplishing the Work, the Contractor shall give the <br />Owner and Designer reasonable advance notice. <br /> <br />If any materials are to be furnished or installed by the Owner or others under the terms of the <br />Contract Documents, said materials shall be made available to the Contractor at the location(s) <br />specified in the Contract Documents. All costs of handling, transportation from the specified <br />location to the Project, storage, and installing of Owner-furnished materials shall be included in <br />the Contract Price. The Contractor shall be responsible for any demurrage, damage, loss, or <br />other deficiencies which may occur during the Contractor's handling, storage, or use of such <br />Owner-furnished material. The Owner shall deduct from any monies due or to become due the <br />Contractor any cost incurred by the Owner in making good any such damage, loss, or efficiency. <br /> <br />All equipment which is proposed to be used in the Work shall be of sufficient size and in such <br />mechanical condition as to meet the requirements of the Work and produce a satisfactory <br />quality of work. Equipment used on any portion of the Work shall be such that no injury to <br />previously completed Work, adjacent property, or existing facilities shall result from its use. <br /> <br />When the methods and equipment to be used by the Contractor accomplishing the Work are not <br />prescribed in the Contract Documents, the Contractor shall be free to use any methods or <br />equipment that will accomplish the Work in conformity with the requirements of the Contract <br />Documents. <br /> <br />When the Contract Documents specify the use of certain methods and equipment, such <br />methods and equipment shall be used unless others are authorized by the Designer. If the <br />Contractor desires to use a method or type of equipment other than specified in the Contract <br />Documents, the Contractor may request authority from the Designer to do so. The request shall <br />be in writing and shall include a full description of the methods and equipment proposed and of <br />Docusign Envelope ID: EF9C08D2-5B75-438B-8D6D-8473F81BD7C4
The URL can be used to link to this page
Your browser does not support the video tag.