Browse
Search
2024-566-E-Emergency Svc-Hexagon Safety, Infrastructure, & Geospatial-CAD Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-566-E-Emergency Svc-Hexagon Safety, Infrastructure, & Geospatial-CAD Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 9:22:46 AM
Creation date
11/19/2024 9:21:34 AM
Metadata
Fields
Template:
Contract
Date
9/13/2024
Contract Starting Date
9/13/2024
Contract Ending Date
9/26/2024
Contract Document Type
Contract
Amount
$2,729,399.34
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County, NC <br /> <br />On-Premise OnCall Dispatch Implementation <br />Statement of Work 89 <br /> Training Phase 56.5 days 317 days <br /> Hexagon-Led Training 35.5 days 317 days <br /> HxGN OnCall Dispatch System Administrator Training 8 days 317 days <br /> HxGN OnCall Dispatch | Train the Trainer Course 1 11 days 325 days <br /> HxGN OnCall Dispatch | Train the Trainer Course 2 10 days 336 days <br /> OnCall Dispatch | Mobile Unit Train-the-Trainer Course 1 10 days 317 days <br /> OnCall Dispatch | Mobile Unit Train-the-Trainer Course 2 8 days 327 days <br /> OnCall Dispatch | Mobile Responder Train-the-Trainer <br />Course 1 2 days 331 days <br /> OnCall Dispatch | Mobile Responder Train-the-Trainer <br />Course 2 2 days 333 days <br /> OnCall Analytics | Admin and User Training 8.75 days 317.25 days <br /> Xalt Developer Training 6 days 346 days <br /> OnCall Citizen Reporting Train-the-Trainer (TTT) 5 days 346 days <br /> Customer-Led End User Training (30 calendar days) 21 days 352.5 days <br /> Test and Training Environment Creation 9.75 days 317 days <br /> Cutover Phase 395.38 <br />days 2 days <br /> Cutover Plan 11.63 days 373.5 days <br /> System Readiness Review 1 day 385.13 days <br /> Cutover to Production Use 383.25 <br />days 2 days <br /> Post Cutover Support Week 1 5 days 385.25 days <br /> Post Cutover Support Week 2 5 days 390.25 days <br /> <br /> <br />Docusign Envelope ID: 463E937D-8F02-4D22-9EEA-B2B50627D9E0Docusign Envelope ID: DE681D27-7D55-4FB6-8C51-9394D26FBC9E
The URL can be used to link to this page
Your browser does not support the video tag.