Browse
Search
2024-566-E-Emergency Svc-Hexagon Safety, Infrastructure, & Geospatial-CAD Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-566-E-Emergency Svc-Hexagon Safety, Infrastructure, & Geospatial-CAD Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 9:22:46 AM
Creation date
11/19/2024 9:21:34 AM
Metadata
Fields
Template:
Contract
Date
9/13/2024
Contract Starting Date
9/13/2024
Contract Ending Date
9/26/2024
Contract Document Type
Contract
Amount
$2,729,399.34
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County, NC <br /> <br />On-Premise OnCall Dispatch Implementation <br />Statement of Work 45 <br /> Biased based profiling data collection <br /> Notifications <br /> Standard Operating Procedures (SOPs) <br /> Event Tags <br /> Special Situations <br /> Event Security <br /> Unit Management <br /> Logging on <br /> Logging off <br /> Unit properties <br /> Logon Group (Lineup) <br /> CAD Searches <br /> Event search <br /> Unit history search <br /> Equipment Search <br /> Broadcasts (a.k.a. BOLOs) <br />Customer Participation and Responsibilities <br /> Provide a Facility; <br /> Provide a Project Workstation for each attendee; <br /> Ensure the attendance and active participation of the Dispatch Core Team members and other <br />SMEs for the duration of the Configuration 3 Workshop; <br /> Participate in discussions and engage with the Hexagon team member; <br /> Track and prioritize requests for configuration of the Configuration 3 Settings on a daily basis <br />during the Configuration 3 Workshop; and <br /> Complete any configurations changes prior to the commencement of Customer Functional <br />Testing. <br />Task Acceptance Criteria <br />This Task is complete upon: (i) the conclusion of the Consulting 3 Workshop and (ii) upon the earlier of, <br />expiration of the Configuration 3 Period or configuration of the Configuration 3 Settings. <br /> <br />Docusign Envelope ID: 463E937D-8F02-4D22-9EEA-B2B50627D9E0Docusign Envelope ID: DE681D27-7D55-4FB6-8C51-9394D26FBC9E
The URL can be used to link to this page
Your browser does not support the video tag.