Browse
Search
2024-566-E-Emergency Svc-Hexagon Safety, Infrastructure, & Geospatial-CAD Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-566-E-Emergency Svc-Hexagon Safety, Infrastructure, & Geospatial-CAD Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 9:22:46 AM
Creation date
11/19/2024 9:21:34 AM
Metadata
Fields
Template:
Contract
Date
9/13/2024
Contract Starting Date
9/13/2024
Contract Ending Date
9/26/2024
Contract Document Type
Contract
Amount
$2,729,399.34
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HxGN OnCall® Dispatch Suite <br /> <br />14 <br /> <br /> <br />HxGN OnCall Dispatch | Backup, Test, and Training <br />Servers <br />Off Site Backup HxGN OnCall Dispatch Servers <br />If the off-site HxGN OnCall Dispatch system performance is expected to match the system <br />performance of the production HxGN OnCall Dispatch system, then the off -site system <br />must be configured identically to the production system. If the off -site database server is <br />going to be a synchronous replica with the primary database server, it must match the <br />primary server configuration. Hexagon recommends that they be configured the same <br />way. <br />Test/Training HxGN OnCall Dispatch Database Servers <br />If the test/training system performance is expected to match the load and system <br />performance of the production HxGN OnCall Dispatch system (for example, used for load <br />testing), then the test/training system must be configured identically to the production <br />system. The test HxGN OnCall Dispatch system is used to test new functionality or <br />updates before deployment on the live system. A training HxGN OnCall Dispatch system <br />is a copy of the live system that is used to train new employees without impact to the live <br />system. In addition to the hardware, if your site requires a HxGN OnCall Dispatch system <br />for test/training and wants that system performance to be identical to their production <br />system, then all software licenses must also be the same. <br />If the test system is not used for load testing, follow the guidelines for a small site for <br />server specifications. Using the Standard edition for the database software is acceptable. <br />If a separate training environment is used, follow the guidelines for a small site for server <br />specifications. Using the Standard edition for the database software is acceptable. <br /> Training licenses are required if training lasts more than 30 days per year, but they can <br />still exist on the test servers. <br />Test and/or Training Interface Communications Servers <br />Configure the test/training servers identically to their production counterparts. <br />Docusign Envelope ID: 463E937D-8F02-4D22-9EEA-B2B50627D9E0Docusign Envelope ID: DE681D27-7D55-4FB6-8C51-9394D26FBC9E
The URL can be used to link to this page
Your browser does not support the video tag.