Browse
Search
2024-564-E-AMS-Willdan Energy Solutions-Southern Human Services Energy Efficiency Improvements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-564-E-AMS-Willdan Energy Solutions-Southern Human Services Energy Efficiency Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 9:20:33 AM
Creation date
11/19/2024 9:20:18 AM
Metadata
Fields
Template:
Contract
Date
9/22/2024
Contract Starting Date
9/22/2024
Contract Ending Date
9/24/2024
Contract Document Type
Contract
Amount
$21,473.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Propos al Provided By :DEC00260603.1 Page 19 <br />15. Contributions for Non-Incentiv ized Work <br />For all eligible customers , this program provides incentives of up to 80% of the cumulative <br />fixed unit price (one-for-one replacement or retro-fit of exis ting equipment and utilizing the <br />existing electrical wiring and mounting hardware) of measures installed by the installation <br />contractor. Work or services outside of this defined scope should be itemized on the "Non- <br />Incentivized Work Form." If the implementation contractor dis covers any unforeseen additional <br />work outside of the program's s cope, the customer should be informed of this additional work <br />and any associated costs at that time. Should any additional work be required for measure <br />installation, the customer will reserve the right to cancel the work for which additional costs <br />are required. All of the following will be considered additional work and all cos ts associated <br />with them shall be the responsibility of the customers: All incremental costs for s pecialty <br />products above the costs of s tandard equipment; All mounting requirements, wiring needs, <br />and other material and labor costs outside the standard scope of a one-for-one replacement <br />or retrofit of existing equipment, including wiring, material, and labor costs associated with <br />compliance with electrical codes . All incremental costs to comply with Prevailing Wage Laws <br />for additional work needed to complete work at the customer's premises; All costs for general <br />waste containers delivered to the installation site (if customer cannot provide general waste <br />containers); All aerial lifts; All staging costs; All costs related to delays to measure <br />implementation that are caused by obstructions , immovable objects , or other impediments to <br />reasonable access to all lighting fixtures and equipment being replaced; All costs associated <br />with the additional time needed to stabilize equipment connected to mislabeled circuit panels; <br />If any work is cancelled by the customer becaus e of the customer's responsibility for non- <br />incentivized work , then all related costs, savings, and incentives proposed for the affected <br />measures will be removed and reflected in the customer's final invoice. <br />Par ticipation Agreement <br />Docusign Envelope ID: 21152D16-5C53-47B8-BDEF-16DCC80DCBDB
The URL can be used to link to this page
Your browser does not support the video tag.