Orange County NC Website
6 <br />Revised 01/24 <br />6.1.1 Attachment D to this Agreement is the Key Milestone Listing which defines the sequence and timing of the design and construction activities. <br />The Designer and its Consultants shall schedule and perform their activities so as to meet the Milestone Dates shown. No deviation by the Designer or <br />his Consultants from the Key Milestone Listing shall be allowed without prior written approval by the Owner. <br />6.1.2 The Designer's schedule for the performance of its activities and the activities of its Consultants shall be in accordance with the outline in <br />Attachment D. The Designer shall also prepare and submit to the Owner for review and approval a schedule of all known items of information, approvals <br />or decisions to be furnished or made by the Owner, including the dates by which the Owner shall have all information necessary from the Designer with <br />respect to that item, approval or decision and the date by which the item of information, approval or decision should be communicated to the Designer. <br />The Owner shall always have a reasonable time within which to provide such item of information, approval or decision and shall not have any <br />responsibility for any delay occurring by reason of the Owner's being unable, through no fault of the Owner, to supply such item of information, approval <br />or decision. <br />6.1.3 Should the Owner determine that the Designer is behind schedule, it may require the Designer to expedite and accelerate its efforts, including <br />providing additional manpower or overtime, as necessary, to perform its services in accordance with the Key Milestone Listing at no additional cost to <br />the Owner. <br />6.1.4 The commencement date for the Designer's Basic Services shall be the date of delivery to the Designer from the Owner of a fully executed <br />original of this Agreement. <br />6.2 Adjustments to the Schedule <br />6.2.1 If the Designer's work on the Project is or will be delayed for more than sixty (60) days through no fault of the Designer, or if the Owner <br />increases or decreases the scope or size of the Project by ten percent (10%) of currently estimated Total Project Cost, the Designer shall give prompt <br />written notice to the Owner. Provided that such notice has been given, the Designer may request in writing an adjustment in the Key Milestone Listing <br />dates, which shall be granted by the Owner to the extent reasonable. <br />ARTICLE 7 <br />DESIGNER'S COMPENSATION <br />7.1 Compensation for Basic Services <br />7.1.1 Compensation for Basic Services shall include all compensation due the Designer from the Owner for all services under this Agreement. <br />7.2 Breakdown of Compensation for Basic Services <br />Not-to-exceed Compensation for Basic Services consists of the following compensation for the following separate categories of services: <br />7.2.1 Schematic Design Phase. Lump Sum (Insert Lump Sum or Time and Materials as appropriate) fee of $11,150.65. <br />7.2.2 Design Development Phase. N/A Included with Schematic Phase fee of 0. <br />7.2.3 Construction Document Phase. Lump sum fee of 12,743.60. <br />7.2.4 Bidding and Contract Award. Lump sum fee of 1,592.95. <br />7.2.5 Construction Phase. Lump sum fee of $6,371.80. <br />7.2.6 Post Construction Phase. Lump sum fee of N/A Included with Construction Phase. <br />7.2.7 Additional Basic Services (Select all that apply): <br />Docusign Envelope ID: 196912C2-67A5-483D-B2E7-A776E88A6770