Orange County NC Website
BALLENTINE ASSOCIATES, PA GENERAL CONDITIONS OF THE AGREEMENT Page 1 of 3 L:\Administrative\BA Staff Resources\3_Proposal Templates + Gen Conds\General Conditions\Current Word Versions\General Conditions of the Agreement.docx 1. Method of Compensation: The Client will be billed either on a fixed fee basis or on an hourly basis for the Scope of Work listed in the Agreement under Basic Services. If the Agreement specifies a fixed fee arrangement, the fixed fees are guaranteed for a duration of (6) months following the date of the proposal and are contingent upon the work covered in the proposal being completed within (18) months from the date of the proposal. If the Agreement specifies an hourly arrangement, billing will be based on the actual number of hours spent performing work described in the Agreement under “Scope of Services” times the following standard hourly rates: Principal ..................................... $195-250/hour Construction Administrator $90-125/hour Director of Engineering ............. $180-210/hour Senior Civil Designer ................. $120-135/hour Project Manager III .................... $170-200/hour Civil Designer II .......................... $105-120/hour Project Manager II ..................... $150-170/hour Civil Designer I ........................... $95-105/hour Project Manager I ...................... $130-150/hour Clerical/Administrative .............. $70-90/hour Professional Engineer II ............. $140-155/hour Director of Survey .................... $140-190/hour Professional Engineer I.............. $125-140/hour Survey Project Manager ............ $110-180/hour Engineering Intern II .................. $110-135/hour Survey CAD Tech ..................... $65-125/hour Engineering Intern I ................... $95-110/hour Survey Field Crew ..................... $100-200/hour Each task listed in the Scope of Services shall be performed by our firm in a manner consistent with the Client’s prior direction, approved preliminary documents and with standard engineering and surveying practices. The rates listed above are subject to change. Hourly invoices will include a breakdown of the time spent on each task, with the date, number of hours, the personnel involved, and a brief description of the work that was performed for each block of time. 2. Additional Services: Any service provided by our firm that is not specifically listed in the Scope of Work shall be an Additional Service. Some typical examples of Additional Services include but are not limited to; (1) redesign requested by the Client, (2) redesign due to a change in policy by a governing jurisdiction, (3) re-staking and (4) construction period extended beyond the time stated in the Agreement. Changes in the Scope of Work, initiated by others, requiring civil design revisions after preliminary plan approval by the Client will be considered Additional Engineering Services. Billing for Additional Services shall be based on one of the following two methods: a) On a fixed fee basis: A fixed Fee Amendment proposal will be prepared for any Additional Service where the scope of work can be clearly defined unless we agree to provide such services on an hourly basis. The Fee Amendment will include a Scope of Work for Additional Services and a fixed fee based on that scope of work. Upon acceptance of the Fee Amendment by the Client, it will become part of the original Agreement and all pertinent sections of this document shall apply. b) On an hourly basis: An hourly Fee Amendment proposal will be prepared for any Additional Service where the scope of work cannot be clearly defined. The Client will be billed on an hourly basis for the actual number of hours spent performing the work described in the Fee Amendment in accordance with the standard hourly rates listed above. An estimated budget can be provided at the Client’s request, but the budget is not to be considered a “not-to-exceed” budget unless specifically stated so. 3. Reimbursable Expenses: The following Reimbursable Expenses and Unit Billing items (together referred to as “Reimbursable Expenses) are not included in the fees quoted for engineering, surveying, or consultant services and will be billed separately with each invoice, unless specifically stated otherwise in the agreement. An estimated budget will be provided for Reimbursable Expenses, but the budget is not to be considered a “not-to-exceed” budget unless specifically stated so. Unit Billing: CAD Plotting (per sheet) Printing/Copying (per sheet) Sheet Size B&W Bond Color BondMylar Photocopies (8 ½ x 11 thru 11 x 17)………..$.25 11 x 17 $0.25 $0.25 $12.00 Facsimile Transmissions (per page)……………..$.25 18 x 24 $2.00 $6.00 $16.00 Large format copies………………………… $2.00 22 x 34 $2.00 $10.00 $17.00 24 x 36 $2.00 $12.00 $18.00 Survey Stakes & Irons (each) 30 x 42 $2.00 $17.50 $25.00 Survey stakes $0.75 36 x 48 $2.00 $24.00 $36.00 Survey Irons (18” iron pipe) $3.00 Docusign Envelope ID: 016C7FF8-5EB3-4D21-A006-0A8906E60E75