Orange County NC Website
Streamflow Rehabilitation Assistance Program, 50% Report, Form v2, June 2024 <br />SECTION 3: PROGRESS REPORT <br />(If 50% goal has been met) <br />Provide a detailed update on all work that has been completed since the contract with NC Division of Soil & Water <br />Conservation was signed. This should be a detailed report that provides an update on both on-the-ground work, as <br />well as all other tasks completed on the project (contacting landowners, bidding projects, drafting engineering <br />designs, etc.). Attach additional pages as necessary. <br />By signing the report below, I certify that to the best of my knowledge and belief the report is true, complete and <br />all expenditures reported are for appropriate purposes. <br />________________________________________________________________ <br />Printed Name and Title Date <br />___________________________________________________________ <br />Signature <br />Docusign Envelope ID: A3C70ABF-EEDE-4822-BD1B-5001B2220A24Docusign Envelope ID: 4952E7F3-6FA3-4165-AD14-AFD0F6E1AE85