Browse
Search
2024-479-E-AMS-F A Jenkins Construction-Inspections and Planning Renovations FY 24-25
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-479-E-AMS-F A Jenkins Construction-Inspections and Planning Renovations FY 24-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 8:13:10 AM
Creation date
11/19/2024 8:13:02 AM
Metadata
Fields
Template:
Contract
Date
8/2/2024
Contract Starting Date
8/2/2024
Contract Ending Date
8/13/2024
Contract Document Type
Contract
Amount
$23,500.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F A Jenkins Construction, Inc <br />402 Avalon Dr <br />Mebane, NC 27302 <br />Office (336) 260-1001 <br />Mjenkins31@triad.rr.com <br /> <br />DATE: FEB. 23, 2024 <br /> <br /> <br /> TO: Alan Dorman <br />Orange County Asset <br />Management Services <br />adorman@orangecountync.gov <br />khamlett@orangecountync.gov <br /> <br /> <br /> <br /> <br />JOB <br />Inspections and Planning Renovations <br /> <br />ITEM # DESCRIPTION QUANTITY <br /> <br />Provide and Install 3 5/8” metal studs, 5/8” drywall (hang & finish) 9’ high and <br />approx. 15’ long (to bottom of existing ceiling), paint wall, install vinyl base <br />(approx. 30 linear feet) for new wall, and install/relocate (1) existing door and <br />frame, relocate existing light switch and install (1) new electrical receptacle in <br />new wall. <br />$14,750.00 <br /> <br />Remove existing wall (approx. 10’ long), patch walls at area where wall was <br />removed, remove (2) existing doors and frames, Infill openings with 3 5/8” <br />metal studs & 5/8” drywall, paint walls, install vinyl base, install a new transition <br />on floor at area where wall was removed. Rework ceiling tiles at area where wall <br />was removed (ceiling tiles only, existing ceiling grid to remain as is). Remove and <br />“cap off” existing electrical in wall that is being removed. <br />$8,750.00 <br /> <br /> <br /> <br /> <br /> Total >>>>>> $23,500.00 <br /> <br />Thank you for your business! <br /> PROPOSAL <br />Docusign Envelope ID: 84126E96-E72A-4AFA-90F3-72980AD9F62B
The URL can be used to link to this page
Your browser does not support the video tag.