Browse
Search
2024-477-E-AMS-Siemens Industry-Hillsborough Commons - Replace Fire Alarm System & Devices
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-477-E-AMS-Siemens Industry-Hillsborough Commons - Replace Fire Alarm System & Devices
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 8:12:07 AM
Creation date
11/19/2024 8:11:54 AM
Metadata
Fields
Template:
Contract
Date
8/7/2024
Contract Starting Date
8/7/2024
Contract Ending Date
8/13/2024
Contract Document Type
Contract
Amount
$249,987.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exclusions <br />1.Smoke control system including fire fighter's fan control panel and status of fans. <br />2.Installation of any device back boxes & required raceway systems. <br />3.Electrical conduit drawings. <br />4.Material added by AHJ that exceeds minimum code requirements. <br />5.Fire Alarm Submittal to AHJ (Siemens will supply the drawings but is not responsible for submitting the <br />drawings to the AHJ for Permit) <br />6.Material added by AHJ that exceeds minimum code requirements. <br />7.Fire Alarm Permit or Electrical Permit or costs associated with Professional Engineers stamp which may be <br />required. <br />8.Security <br />i.Security power supplies that require FA interconnections were not shown and will be considered a <br />change in scope. <br />j.Fire alarm control relays for magnetic locks that are required by code to be released upon FA <br />activation. <br />11.Offsite monitoring systems fees <br />12.120 VAC power <br />13.Working in areas containing hazardous materials. <br />14.Cost associated with schedule acceleration or multiple unplanned phases. <br />15.Cost associated with multiple trips to the job site due to incomplete or delayed work by others. <br />16.Telephone lines for system monitoring. <br />17.Ceiling removal or replacement, patching, and painting. <br />18.Costs associated with bypassing the system during construction. <br />19.Overtime (except as specifically noted) <br />20.Performance or payment bonds <br />21.Bonding or special insurance <br />22.Providing or installation of Knox box <br />23.Providing or installation of sprinkler bell <br />24.Providing or installation of non-fire alarm carbon monoxide sensors <br />25.Fire caulking openings not caused by Siemens's installers. <br />26.Liquidated damages <br />27.Firewatch <br />28.Providing or installation of shunt trip breakers <br />29.Any costs associated with obtaining CAD (dwg) files for this project. <br />30.Duct detector velocity testing. <br />31.Provisions for a temporary certificate of occupancy <br />32.DOL Inspections <br />33.Existing Wire Troubleshooting <br />Page 6 of 12 <br />Docusign Envelope ID: 0F2C32B1-263B-4DEF-85C5-1E191443260C
The URL can be used to link to this page
Your browser does not support the video tag.