Orange County NC Website
 1. Locating proper column locations is critical. Care must be taken to keep columns plumb and walls square to each other. 2. Shelter should be sloped slightly to the rear for proper drainage. Approximately 1/4 inch slope per ft. from front to rear of shelter is recommended. Columns should be shimmed as necessary. 3. Anchors to be installed in conjunction with manufacturers recommendations only. (See Expansion Anchor Technical Chart on previous page.) 4. Anchors need to be installed a minimum of 6 inches from the edge of the concrete pad. See below for reference. NOTE: This visual is for reference only. Brasco is not liable for concrete installation instructions unless structural concrete calculations are included with an order. Consult your local building codes for specific concrete pad requirements. RECOMMENDED: Brasco recommends a minimum 4 inch thick, 3000 PSI concrete pad for areas with wind speeds lower than 110 MPH. The concrete pad should allow a minimum of 6 inches around the shelter’s perimeter to prevent concrete breakage when anchoring. Concrete may or may not require additional reinforcement. (313) 393-0393 | www.brasco.com © 2017 Brasco International, Inc. All Rights Reserved. Standard Brasco Anchoring Guidelines Expansion Anchor Installed Standard Concrete Pad Overview Docusign Envelope ID: 1161C0A3-27D1-45D2-B2D8-A2C8BF0ADDC9