Browse
Search
Agenda - 11-19-2024; 8-f - Procurement of Replacement Radio Infrastructure for Fire and EMS Paging and Approval of Budget Amendment #3-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2024
>
Agenda - 11-19-2024 Business Meeting
>
Agenda - 11-19-2024; 8-f - Procurement of Replacement Radio Infrastructure for Fire and EMS Paging and Approval of Budget Amendment #3-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 11:46:56 AM
Creation date
11/14/2024 11:47:27 AM
Metadata
Fields
Template:
BOCC
Date
11/19/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-f
Document Relationships
Agenda for November 19, 2024 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 11-19-2024 Business Meeting
Minutes 09-26-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
Minutes 10-01-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
Minutes 10-08-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
Minutes 10-15-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
ORD-2024-039-Fiscal Year 2024-25 Budget Amendment #3
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2024
ORD-2024-040-Procurement of Replacement Radio Infrastructure for Fire and EMS Paging and Approval of Budget Amendment #3-A
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2024
ORD-2024-041-Sportsplex Ice Rink Cooling Tower and Chiller Replacement Contract Award and Approval of Budget Amendment #3-B
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2024
OTHER-2024-097-Interlocal Agreement Renewal – Hollow Rock Nature Park
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-098-Procurement of Replacement Radio Infrastructure for Fire and EMS Paging and Approval of Budget Amendment #3-A
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
PRO-2024-026-Native American Heritage Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
RES-2024-064-Resolution of Commendation for Commissioner Anna Richards
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID:A05892FB-E22F-4F9D-8892-114F73CBF1B7 <br /> SECTION 1 <br /> STATEMENT OF WORK <br /> 1 .1 OVERVIEW <br /> This Statement of Work(SOW)describes the deliverables to be furnished to Orange County,NC. <br /> The tasks described herein will be performed by Motorola, its subcontractors,and Orange County, <br /> NC(the Customer)to implement the 5 site VHF single channel paging system described in the <br /> System Description. It describes the actual work involved in installation, identifies the installation <br /> standards to be followed,and clarifies the responsibilities for both Motorola and the Customer during <br /> the project implementation. Specifically,this SOW provides: <br /> • A summary of the phases and tasks to be completed within the project lifecycle. <br /> • A list of the deliverables associated with the project. <br /> • A description of the responsibilities for both Motorola and the Customer. <br /> • The qualifications conditions taken into consideration during the development of this <br /> project. <br /> This SOW provides the most current understanding of the work required by both parties to ensure a <br /> successful project implementation. Should any of the sites change from this design, a revision to the <br /> SOW and associated pricing will be required in the form of a change order. It is understood that this <br /> SOW is a working document, and that it will be revised as needed to incorporate any changes <br /> associated with contract negotiations,Contract Design Review(CDR), and any other change orders <br /> that may occur during the execution of the project. <br /> 1 .2 GENERAL RESPONSIBILITIES <br /> Motorola has based the system design on information provided by Orange County,NC and an <br /> analysis of their system requirements. Should the below responsibilities be deemed incorrect or not <br /> agreeable to, a revised proposal with the necessary changes and adjusted costs may be required. <br /> Changes to the equipment or scope of the project after contract may require a change order. <br /> • All work is to be performed during normal work hours,Monday through Friday 8:00 a.m. to 5:00 <br /> p.m.,excluding Motorola and Customer observed holidays. <br /> • There is sufficient space,utilities and HVAC available to install the new equipment. <br /> • The existing backup power(UPS,generator)is capable of supporting the new equipment. <br /> • The existing site grounding meets R56 standards. <br /> • The installation of the paging at Chatham Mountain, Eno Mountain, and the Orange County <br /> Primary 911 Center will not require any special equipment such as a crane,helicopter,or invasive <br /> mounting structures. <br /> • Orange County,NC will obtain any MOUs or lease agreements necessary to install the proposed <br /> equipment. <br /> Orange County,North Carolina July 19,2024 <br /> VHF Paging System Upgrades Use or disclosure of this proposal is subject <br /> to the restrictions on the cover page. <br /> © Motorola Solutions Confidential Restricted Statement Of Work 1-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.