Browse
Search
Agenda - 11-19-2024; 8-f - Procurement of Replacement Radio Infrastructure for Fire and EMS Paging and Approval of Budget Amendment #3-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2024
>
Agenda - 11-19-2024 Business Meeting
>
Agenda - 11-19-2024; 8-f - Procurement of Replacement Radio Infrastructure for Fire and EMS Paging and Approval of Budget Amendment #3-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 11:46:56 AM
Creation date
11/14/2024 11:47:27 AM
Metadata
Fields
Template:
BOCC
Date
11/19/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-f
Document Relationships
Agenda for November 19, 2024 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 11-19-2024 Business Meeting
Minutes 09-26-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
Minutes 10-01-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
Minutes 10-08-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
Minutes 10-15-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
ORD-2024-039-Fiscal Year 2024-25 Budget Amendment #3
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2024
ORD-2024-040-Procurement of Replacement Radio Infrastructure for Fire and EMS Paging and Approval of Budget Amendment #3-A
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2024
ORD-2024-041-Sportsplex Ice Rink Cooling Tower and Chiller Replacement Contract Award and Approval of Budget Amendment #3-B
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2024
OTHER-2024-097-Interlocal Agreement Renewal – Hollow Rock Nature Park
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-098-Procurement of Replacement Radio Infrastructure for Fire and EMS Paging and Approval of Budget Amendment #3-A
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
PRO-2024-026-Native American Heritage Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
RES-2024-064-Resolution of Commendation for Commissioner Anna Richards
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID:A05892FB-E22F-4F9D-8892-114F73CBF1B7 <br /> 11 <br /> • Create Ship Views,to confirm with the Customer the secure storage location(s)to which the <br /> equipment will ship. Ship Views are the mailing labels that carry complete equipment shipping <br /> information,which direct the timing,method of shipment,and ship path for ultimate destination <br /> receipt. <br /> • Create equipment orders. <br /> • Reconcile the equipment list(s)to the Contract. <br /> • Procure third-party equipment if applicable. <br /> Orange County Responsibilities: <br /> • Approve shipping location(s). <br /> • Complete and provide Tax Certificate information verifying tax status of shipping location. <br /> Completion Criteria: <br /> • Verify that the Equipment List contains the correct model numbers,version,options,and delivery <br /> data. <br /> • Trial validation completed. <br /> • Bridge the equipment order to the manufacturing facility. <br /> 1 .6 MANUFACTURING AND SHIPMENT <br /> 1.6.1 Manufacture Motorola Fixed Network Equipment <br /> Motorola Responsibilities: <br /> • Manufacture the Fixed Network Equipment(FNE)necessary for the system based on equipment <br /> order. <br /> Orange County Responsibilities: <br /> • None. <br /> Completion Criteria: <br /> • FNE shipped to the field. <br /> 1.6.2 Manufacture Non-Motorola Equipment <br /> Motorola Responsibilities: <br /> • Procure non-Motorola equipment necessary for the system based on equipment order. <br /> Orange County Responsibilities: <br /> • None. <br /> Completion Criteria: <br /> • Ship non-Motorola manufactured equipment to the field. <br /> 1.6.3 Ship Equipment to Field <br /> Motorola Responsibilities: <br /> • Pack system for shipment to final destination. <br /> • Arrange for shipment to final destination. <br /> Orange County,North Carolina July 19,2024 <br /> VHF Paging System Upgrades Use or disclosure of this proposal is subject <br /> to the restrictions on the cover page. <br /> © Motorola Solutions Confidential Restricted Statement Of Work 1-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.