Orange County NC Website
8 <br /> Orange County,NC July 31,2024 <br /> Emergency Radio Response Coverage <br /> 2.2 Orange County, NC Responsibilities <br /> Orange County will take responsibility for the installation and performance of all other equipment and <br /> work necessary for completion of this project that is not provided by Motorola. General responsibilities <br /> for Orange County include the following: <br /> • Assigning a project manager, as one point of contact, to work with Motorola and has the <br /> authority to to make decisions on behalf of Orange County. <br /> • Reviewing the preliminary Project Schedule with Motorola's Project Manager and assisting <br /> Motorola Solutions in developing a Project Schedule to define the detailed tasks and timeline <br /> for the completion of Motorola Solutions and Orange County responsibilities. <br /> • For Public Safety DAS Solutions, Motorola will demarc all alarm outputs within 3 feet of the <br /> installed BDA and BBU. If needed, Orange County will need to use their preferred electrical <br /> and alarm vendor to connect the alarm to the building fire safety panel. <br /> • Orange County is responsible for any costs associated with any required third-party inspection <br /> of wall penetrations. <br /> • Orange County is responsible for any costs, materials, and labor if roof penetrations and the <br /> associated conduit are needed/required to complete the installation. <br /> • Ensure communications sites meet space, grounding, power, and connectivity requirements for <br /> the installation of all equipment. <br /> • Provide floor plans in soft copy (Visio or AutoCAD). <br /> • Provide any necessary FCC license modification for the new BDA system.The costs of this is <br /> the responsibility of Orange County. <br /> • Provide six pairs of conductors brought to into the BBU. Pairs shall be labeled: Alarm 1, Alarm <br /> 2, Alarm 3, Alarm 4, Alarm 5, Alarm6, etc. <br /> • County shall leave (6) resisters with the conductors in order for appropriate alarm system <br /> operation. <br /> • Approve locations for all equipment in sites. <br /> • Approve cable pathways for all DAS cabling. <br /> • Provide applicable permits. <br /> • Orange County will provide 120 VAC/15A electrical outlet (dedicated breaker recommended) <br /> for the proposed equipment installation. <br /> • Orange County is providing safe, secure onsite storage for the equipment and materials at <br /> each school location. <br /> • Coordinate the activities of all Orange County vendors or other contractors. <br /> • Orange County shall provide asset tags to MSI at the start of each installation for tagging. <br /> Statement of Work 9 MOrOMOLA SOLUTIONS <br /> Use or disclosure of this proposal is subject to the restrictions on the cover page. r <br /> Motorola Solutions <br /> 6 <br />