Orange County NC Website
MOTOROLA SOLUTIOIVS QUOTE-2735184 <br /> Orange County Schools - BDA Phase <br /> 2 <br /> • J-hooks will be used to support the coaxial cable above the ceiling. <br /> • Riser Space between floors is available. Coring between floors and/or vertical roof penetrations are not <br /> required and is excluded from the quotation. <br /> • The customer must provide any roof penetration for donor antennas. Any sidewall penetrations will be <br /> completed by MCA/MSI. <br /> • The design does not account for coax and/or fiber to not be installed in conduit and does not include <br /> installation of cable tray nor raceway. <br /> • Adequate Electrical Service and Grounding are available within 6' of the active equipment locations. <br /> • Installation services will be conducted during normal business hours (8 am to 5 pm, Monday through Friday). <br /> • Patching and painting not included in quotation- access panels should be available for access to the <br /> ceiling. <br /> • Any damage after installation caused by other trades will result in a change order. <br /> • As-builts and submittal packages including benchmark results will be provided to the owner at the <br /> completion of the project. <br /> • All indoor coax&fiber installed in plenum space is plenum rated. No coaxial or fiber cable in this quotation is <br /> rated for burn survivability nor installed in conduit. For burn survivability and conduit, please request a re- <br /> quote. <br /> • The Proposed Solution only includes 700/800 MHz channels, additional frequency bands or changes through <br /> add/ deletion or P25 Upgrades may require the equipment to be reprogrammed. <br /> • Facility Owner is responsible for all cabling & conduit between DAS and Fire Alarm Panel and is excluded from <br /> this budgetary quotation. <br /> • Fire Alarm interface and programming provided by others and are not included in the quotation. Dry contacts <br /> for Public Safety DAS equipment are provided only. <br /> • The venue is responsible to have Fire Alarm Control Panel Relay delivered to within 3'of the PS Repeater and <br /> BBU. <br /> • The design is based on -95 dBm RSSI over 95% of the coverage area. <br /> • The design is based on -95 dBm RSSI over 99% of critical areas as defined by local NFPA requirements. <br /> • Design is based on the fact that a grid test consisting of 20 measurements per floor will be acceptable for <br /> final inspection results per NFPA requirements. <br /> • Dry contacts will be available for the Fire Alarm interface per IFC section 510-Any additional contacts will <br /> result in a change order <br /> • Quotation includes GROL-certified Engineers and installation staff as required by the local jurisdiction. <br /> • Phasing is not included in the quotation. This quote is bases on work being completed in 1 deployment. <br /> Any additional phasing requirements/trips will result in a change order. Any canceled PO's are subject to <br /> an equipment restocking fee and any unreturnable equipment due to canceled PO will be invoiced at full <br /> cost. <br /> Unless otherwise noted, this quote excludes sales tax or other applicable taxes (such as Goods and Services <br /> Tax, sales tax, Value Added Tax and other taxes of a similar nature). Any tax the customer is subject to will be <br /> added to invoices. <br /> Any sales transaction following Motorola's quote is based on and subject to the terms and conditions of the valid and executed written contract between Customer and Motorola(the <br /> ""Underlying Agreement"")that authorizes Customer to purchase equipment and/or services or license software (collectively""Products""). If no Underlying Agreement exists between <br /> (D Motorola and Customer, then Motorola's Standard Terms of Use and Motorola's Standard Terms and Conditions of Sales and Supply shall govern the purchase of the Products. <br /> Motorola Solutions,Inc.:500 West Monroe,United States-60661—#:36-1115800 <br /> 14 <br />