Orange County NC Website
11 <br /> Orange County,NC July 31,2024 <br /> Emergency Radio Response Coverage <br /> 2.5 Timeline Estimation <br /> Week Scope Duration Notes <br /> 1 PO Received from Orange County N/A <br /> MSI Begins Preliminary Design <br /> 2 Walks for All 15 Schools 3 Weeks <br /> 3 MSI Finalizes Designs 2 Weeks <br /> 5 Materials on Order for all locations 6 Weeks Subject to change based on outsourced vendors <br /> Installation of Materials at 15 20 MSI will work with County to identify appropriate <br /> 12 Schools Weeks order of installs <br /> Finish Commissioning of the <br /> 32 System at each location 2 Weeks Coordination with AHJ/FM will be required <br /> These will be completed as the schools complete and <br /> the Fire Alarm monitoring is in place from the <br /> 34 Inspections N/A customer <br /> *This timeline is only an estimate. <br /> *Subject to Shipment Delays out of MSI control. <br /> Statement of Work MOTOROLA SOLUTIONS <br /> Use or disclosure of this proposal is subject to the restrictions on the cover page. r <br /> Motorola Solutions <br /> 9 <br />