Orange County NC Website
10 <br /> Orange County,NC July 31,2024 <br /> Emergency Radio Response Coverage <br /> • Horizontal fire wall penetrations are in place and Freight elevator service will be available to all <br /> levels. <br /> • Adequate Electrical Service and Grounding are available within 6' of the active equipment <br /> locations. <br /> • J-hooks will be used to support the coaxial cable above the ceiling. <br /> • Riser Space between floors is available. Coring between floors and/or vertical roof <br /> penetrations are not required and is excluded from the quotation. <br /> • All proposed cable paths are accessible and can be reached with an 8-foot ladder. <br /> • Asbestos monitoring/abatement is not required nor included in the quotation. No HEPA or <br /> Tenting is needed for any work. <br /> • Access panels to allow access to areas inside hard, finished ceilings will be provided / <br /> installed by others if necessary. <br /> • Patching and painting not included in quotation- access panels should be available for <br /> access to the ceiling. <br /> • Scaffolding, bucket trucks and/or lifts are not required for delivery of this project. <br /> • Adequate off-air, RF signal exists for Public Safety frequencies. <br /> • Any damage after installation caused by others will result in a change order. <br /> • All indoor coax &fiber installed in plenum space is plenum rated. No coaxial or fiber cable in <br /> this quotation is rated for burn survivability nor installed in conduit. For burn survivability and <br /> conduit, please request a re-quote. <br /> • The Proposed Solution only includes 700/800 MHz channels, additional frequency bands or <br /> changes through add/deletion or P25 Upgrades may require the equipment to be <br /> reprogrammed. <br /> • Phasing is not included in the quotation. This quote provides that work will be completed in <br /> 1 deployment. Any additional phasing requirements/trips will result in a change order. Any <br /> canceled PO's are subject to an equipment restocking fee and any unreturnable equipment <br /> due to canceled PO will be invoiced at full cost. <br /> • Facility Owner is responsible for all cabling & conduit between DAS and Fire Alarm Panel and <br /> is excluded from this quotation. <br /> • Fire Alarm interface and programming provided by others and are not included in the <br /> quotation. Dry contacts for Public Safety DAS equipment are provided only. <br /> • Orange County is responsible to have Fire Alarm Control Panel Relay delivered to within 3' of <br /> the PS Repeater and BBU. <br /> 2.4 Change Order Process <br /> Either Party may request changes within the general scope of this Agreement. If a <br /> requested change causes an increase or decrease in the cost, change in system <br /> configuration or adds time to the project's timeline required to perform this Agreement, <br /> the Parties will agree to an equitable adjustment of the Contract Price, Performance <br /> Schedule, or both, and will reflect the adjustment in a change order. Neither Party is <br /> obligated to perform requested changes unless both Parties execute a written change <br /> order. <br /> Statement of Work MOTOROLA SOLUTIONS <br /> Use or disclosure of this proposal is subject to the restrictions on the cover page. r <br /> Motorola Solutions <br /> 8 <br />