Browse
Search
Agenda - 11-19-2024; 6-a - Transportation Multimodal Plan
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2024
>
Agenda - 11-19-2024 Business Meeting
>
Agenda - 11-19-2024; 6-a - Transportation Multimodal Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 11:45:04 AM
Creation date
11/14/2024 11:47:23 AM
Metadata
Fields
Template:
BOCC
Date
11/19/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for November 19, 2024 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 11-19-2024 Business Meeting
Minutes 09-26-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
Minutes 10-01-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
Minutes 10-08-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
Minutes 10-15-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
Minutes 11-19-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
ORD-2024-039-Fiscal Year 2024-25 Budget Amendment #3
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2024
ORD-2024-040-Procurement of Replacement Radio Infrastructure for Fire and EMS Paging and Approval of Budget Amendment #3-A
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2024
ORD-2024-041-Sportsplex Ice Rink Cooling Tower and Chiller Replacement Contract Award and Approval of Budget Amendment #3-B
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2024
OTHER-2024-097-Interlocal Agreement Renewal – Hollow Rock Nature Park
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-098-Procurement of Replacement Radio Infrastructure for Fire and EMS Paging and Approval of Budget Amendment #3-A
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
PRO-2024-026-Native American Heritage Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
RES-2024-064-Resolution of Commendation for Commissioner Anna Richards
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br /> NORTH CAROLINA <br /> 97 <br /> The new ground area was cross section <br /> minimum <br /> calculated for all TMP <br /> project except for roadway �� �� �- right of way Difference Calculate <br /> between a <br /> future and new <br /> intersections,bicycle and - ' � ' existing ground <br /> pedestrian bridges,and transit. Calculate ris ect area in <br /> the average project <br /> acres <br /> New ground area is a metric width of width <br /> for the Cost parameter used to selected <br /> determine additional right-of- road <br /> Select road segments <br /> way needed. segments <br /> located —0 7 <br /> Figure 6.11 illustrates the completely Existing Difference —id e <br /> workflow used to calculate within the ground length 9 <br /> buffer between length <br /> a project's new ground area. futL:re anc' <br /> Predefined values are illustrated ekl::tII1C; <br /> ct <br /> in blue cells,while bridge Future project Ixgth <br /> length lenliytli <br /> length,located in a yellow cell, <br /> was determined in the bridge <br /> area workflow. Figure 6.11: New Ground Area Workflow <br /> Select Calculate 7 F yc;e calculate <br /> socioeconomic socic-•::-mo, i- p•opr.:•rtiC:•n�l <br /> TAZs located ----0 metric betV^eer C:•_.cFCC;r :miic <br /> within the 2020 and 2050 rnetric per Figure 6.12 illustrates the <br /> buffer per selected TAZ selected TAZ workflow used to determine <br /> either socioeconomic metric <br /> -population or employment. <br /> Calculate the Add the Average population and <br /> acreage per proportion of proportional employment that surrounds the <br /> selected TAZ selected TAZ cF(:C:•r•_miic <br /> bicycle and pedestrian and transit <br /> and the entire rvetri:.of the <br /> TAZ acreage selected TAZs TMP projects was calculated. <br /> talc elate the Average population and <br /> acleaye per employment are metrics that <br /> selected TAZ <br /> l 1 Calculate the satisfy the Density parameter. <br /> socioeconamic <br /> metric per Population and employment data <br /> mile fnr the was sourced from the TRMG2 <br /> project model and is calculated at traffic <br /> analysis zone(TAZ)unit level. <br /> Figure 6.12:Average Population and Employment Workflow <br /> PAGE 58 Orange County Transportation Multimodal Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.