Orange County NC Website
ORANGE COUNTY <br /> NORTH CAROLINA <br /> 93 <br /> Table 6.8:TRMG2 Modifications <br /> NetworkTPMG2 Socio-econornic Data Network within Outside <br /> mod .. Orange County Orange County <br /> No Build <br /> 2050 2020 Base year network 2050 Future year network <br /> Network <br /> 2050 FY Network+ <br /> Build Network 2050 Additional Orange County 2050 Future year Network <br /> Projects <br /> In addition to the TRMG2 data,the other datasets used to calculate project scores are shown in Table 6.9. <br /> Table 6.9:TRMG2 Modifications <br /> • 0 . . - • • - • <br /> Transportation To determine the areas where transportation NCDOT Environmental <br /> disadvantaged populations are concentrated. <br /> Disadvantage positive scores for bike ped and transit, negative Justice/Transportation <br /> Index Disadvantage Index Tool <br /> for roadways <br /> 1. Current (2020) and future (2050) population <br /> and employment <br /> TRMG2 2. 2020 network volumes and V/C ratios TRMG2 V1.3.1 <br /> 3. 2050 no-build and build volumes and <br /> V/C ratios <br /> Section Safety NCDOT-generated safety score for all state- NCDOT Section Safety <br /> Score maintained roads. Score <br /> Bike-ped Number,location and crash severity of all NCDOT Bicyclist and <br /> crashes bicycle and pedestrian crashes in the county. Pedestrian Crash Map <br /> Tax parcels within Orange County to estimate <br /> Parcels the right-of-way impact of the projects which NC One Map <br /> feeds into the cost calculation <br /> NC Route Existing right-of-way of the roadways <br /> Characteristics maintained by NCDOT.This is used to estimate NCDOT GIS Data Layers <br /> the cost impact of roadway widening projects. <br /> Points of Addresses with civic,commercial,community, <br /> Interest cultural, institutional, retail,and religious Orange County Addresses <br /> classifications <br /> Schools Public,charter,and private grade schools NC One Map <br /> PAGE 54 Orange County Transportation Multimodal Plan <br />