Browse
Search
Agenda - 11-19-2024; 6-a - Transportation Multimodal Plan
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2024
>
Agenda - 11-19-2024 Business Meeting
>
Agenda - 11-19-2024; 6-a - Transportation Multimodal Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 11:45:04 AM
Creation date
11/14/2024 11:47:23 AM
Metadata
Fields
Template:
BOCC
Date
11/19/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for November 19, 2024 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 11-19-2024 Business Meeting
Minutes 09-26-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
Minutes 10-01-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
Minutes 10-08-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
Minutes 10-15-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
Minutes 11-19-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
ORD-2024-039-Fiscal Year 2024-25 Budget Amendment #3
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2024
ORD-2024-040-Procurement of Replacement Radio Infrastructure for Fire and EMS Paging and Approval of Budget Amendment #3-A
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2024
ORD-2024-041-Sportsplex Ice Rink Cooling Tower and Chiller Replacement Contract Award and Approval of Budget Amendment #3-B
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2024
OTHER-2024-097-Interlocal Agreement Renewal – Hollow Rock Nature Park
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-098-Procurement of Replacement Radio Infrastructure for Fire and EMS Paging and Approval of Budget Amendment #3-A
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
PRO-2024-026-Native American Heritage Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
RES-2024-064-Resolution of Commendation for Commissioner Anna Richards
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br /> NORTH CAROLINA <br /> 92 <br /> In addition to the mode specific parameters,the projects were scored based on four other factors in different <br /> proportions based on the mode.The type and proportion of these parameters are mentioned in Table 6.7.The <br /> survey weights were adjusted based on whether a category is applicable to a mode or not.Detailed descriptions of <br /> these factors are included in Appendix VII. <br /> -• • Weight Weight Parameter Weight Parameter Weight Parameter <br /> 27% 38% TDI 73% TDI 27% Negative TDI <br /> Bike Ped <br /> Safety33% 48% Crash - - 33% Section Safety <br /> Severity Score <br /> • (inverse Construction Capital Construction <br /> 10% 14% &ROW Cost 27% cost 10% &ROW Cost <br /> Multim•• 30% - - - - 30% Bike Ped <br /> consideration considerations <br /> Table 6.7: Other factors used in calculating scores for all modes <br /> Step 4—Collecting,cleaning,and organizing the data. <br /> The calculation of the aforementioned parameters As a result,it was decided that the roadway network <br /> required comprehensive data identification,collection, within Orange County as it existed in 2020(plus <br /> cleaning,and organizing. I-885 in Durham County)would be considered as <br /> the no-build network,and the build network will <br /> The primary dataset used to calculate most roadway- include all roadway network enhancements planned <br /> related parameter scores was developed using the Triangle in the official model and additional projects from <br /> Regional Model 2nd Generation Version 1.3.1(TRMG2 the TMP(that are not in the official model).Note <br /> V1.3.1).In order to get an accurate impact of building a that outside Orange County boundaries,the official <br /> project,the ideal approach is to compare the model results future year network was left unchanged for both <br /> without that project(no-build)and the results with that build and no-build networks.This was done to <br /> project(build).Doing this for every project in the TMP list isolate the impacts of projects only within Orange <br /> was extremely time consuming,and the key purpose of this County,keeping the rest of the region constant. <br /> prioritization undertaking was to reduce the level of effort <br /> required to develop the prioritized list of projects. <br /> Orange County Transportation Multimodal Plan PAGE 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.